advanced work · the 4100-4400 block of S Figueroa St (public right-of-way), Los Angeles, CA 90037
Repaint a faded high-visibility crosswalk, crossing 1 -- the 4100-4400 block of S Figueroa St (public right-of-way), Los Angeles, CA 90037.
Fund it for $520. Proof lands onchain when it's done.
$520 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesA marked crosswalk along this corridor has worn down to a ghost outline, so drivers no longer see where pedestrians have the right of way at this crossing.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + the approved temporary traffic-control plan, cones, signs and, where required, a flagger
- MUTCD-spec marking paint or thermoplastic with the specified glass-bead retroreflective media
- stencils and layout string or chalk line sized to the MUTCD pattern
- surface preparation tools: broom, blower, and a scraper for failed marking
- hi-vis apparel to ANSI/ISEA 107, gloves, respirator suited to the coating
- camera + GPS phone + a thermometer for the surface-temperature check
Steps
- 1. ASSESS: photograph the existing marking as found, record which MUTCD pattern applies, and confirm the permit and the approved traffic-control plan for this closure.
- 2. Set the temporary traffic control exactly as the approved plan draws it, including the pedestrian detour, before any work in the roadway begins.
- 3. Prepare the surface: sweep and blow clean, remove failed marking, and confirm the surface is dry and within the coating's temperature window.
- 4. Lay out the pattern to MUTCD dimensions (bar width, spacing, stop-bar setback) and check it against the layout before any paint goes down.
- 5. Apply the marking to the specified wet-film thickness and broadcast the glass beads at the specified rate while the coating is still wet.
- 6. VERIFY: measure the finished bar widths and spacing against the MUTCD dimensions, hold the closure for the full cure time, then reopen and remove the traffic control.
- 7. Photograph the finished marking from the before vantage, log the permit reference, product, and cure time, and enter them in the proof record.
What counts as done
- Before photo of the faded/worn crosswalk markings
- City traffic-control permit + lane-closure/flagger plan reference
- Durable, reflective road-marking product spec sheet matched to the applied coverage
- After photo of the fully legible, high-visibility crosswalk pattern
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788182937796_e2nq5lu","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.