advanced work · Row-house demolition corridor, Camden, NJ

OSHA Subpart T pre-demolition engineering-survey check, Row-house demolition corridor (Camden).

Fund it for $540. Proof lands onchain when it's done.

$540 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.

What the work involves

A Camden row-house demolition affects party walls shared with occupied homes, with no written engineering survey of adjacent structures, unverified utility shutoffs, and pre-demolition asbestos status unknown per OSHA Subpart T.

Where
Row-house demolition corridor, Camden, NJ · Open the map
Pay
$540 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
photo from outside/safe positions per checklist section + GPS + Subpart T checklist + engineering-survey/utility/asbestos/access status + tiered findings routed to the competent person

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-09-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • hard hat + safety glasses + hi-vis vest + sturdy boots (site PPE)
  • tablet/clipboard with the Subpart T pre-demolition checklist
  • camera with zoom (document structure condition from outside / safe positions)
  • flashlight
  • copy request forms for the written engineering survey + utility shutoff confirmations

Steps

  1. 1. Check in with the demolition contractor's competent person; confirm scope, don PPE, and confirm you observe-and-document only, you never enter a structurally compromised structure, never authorize demolition, and never disturb suspect materials.
  2. 2. Written engineering survey: verify a competent person's WRITTEN engineering survey of the structure AND affected adjacent structures exists on site (framing/floors/walls condition, unplanned-collapse possibility) and photograph its cover/signature page (§1926.850(a)); note bracing/shoring where fire or weathering has weakened members (§1926.850(b)).
  3. 3. Utilities: document shutoff/cap/control confirmation for electric, gas, water, steam, and sewer lines outside the building line, or the documented relocation/protection plan if a utility must stay live during the work, and that utility companies were notified (§1926.850(c–e)).
  4. 4. Hazardous materials: verify the hazardous-material determination is on file, including the NESHAP pre-demolition asbestos survey, and that any chemicals/gases/flammables in pipes or tanks were purged or controlled before work (§1926.850(f)); never sample or disturb suspect material yourself.
  5. 5. Access & falling-hazard protection: photograph protected employee entrances (sidewalk sheds/canopies where required), condition of stairways/passageways to be used, and barricading that keeps the public out of the demolition and debris-fall zones (§§1926.850(h–k)/.851).
  6. 6. Mechanical demolition (if underway or planned): from outside the exclusion zone, confirm no workers are inside the structure during ball/clamshell or machine demolition and the exclusion zone is barricaded (§1926.859).
  7. 7. For each finding, mark the condition against the Subpart T checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person / engineer.
  8. 8. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the competent person with a timestamp, never direct the demolition yourself.

What counts as done

  • Written engineering survey (structure + adjacent structures) verified and its cover/signature page photographed; bracing/shoring of weakened members noted
  • Utility shutoff/cap/control confirmations (electric/gas/water/steam/sewer) or the documented live-line protection plan photographed
  • Hazardous-material determination incl. the NESHAP pre-demolition asbestos survey verified on file
  • Protected access, public barricading, and any mechanical-demolition exclusion zone photographed + GPS / address confirm
  • Tiered findings list (stop-work / correct-before-proceed / monitor) with the competent person / engineer named + timestamp of stop-work items routed

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788183238493_0cbehqi","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.