Anyone can start here · 2800-2900 block of Dr. Andrew J. Brown Avenue, Martindale-Brightwood, Indianapolis, IN 46218
Document the peeling exterior paint on a pre-1978 home on Dr. Andrew J. Brown Avenue.
Fund it for $200. Proof lands onchain when it's done.
$200 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee.
What the work involvesPeeling exterior paint on this Martindale-Brightwood home's pre-1978 siding is a suspected lead-paint hazard -- photographing and reporting it is the safe first step; no one scrapes or samples it here.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- camera (close-up capable for paint-condition photos)
- tablet/clipboard with the room-by-room paint-condition checklist
- flashlight
- tape measure (deteriorated-paint extent, window/door friction surfaces)
- county assessor / permit record for year-built confirmation
Steps
- 1. Confirm the home's year built from assessor/permit records and the household's renovation intent (which rooms, which surfaces, kids or a pregnant occupant in the home?). Pre-1978 + planned paint disturbance = the RRP Rule applies to the work, record that determination.
- 2. Walk room by room photographing paint condition: intact vs deteriorated (peeling, chipping, chalking, flaking) with approximate square footage per surface, without touching, scraping, or disturbing anything.
- 3. Document friction and impact surfaces separately (window sashes/wells, door edges, stair treads, porch floors), the highest-exposure surfaces for children, plus any visible paint dust or chips at floors and window troughs.
- 4. Map the household's planned renovation against the inventory: which planned activities would disturb painted surfaces (and exceed RRP de minimis. >6 sq ft interior / >20 sq ft exterior per room/component), and which are paint-safe as planned.
- 5. Assemble the lead-safe renovation package: the room-by-room condition inventory, the disturbance map, the requirement that a certified firm perform testing (EPA-recognized kits or an XRF by a certified inspector) and all disturbing work, and the local lead-hazard-control grant / health-department programs the family may qualify for.
- 6. Review with the household in plain words: what can proceed now, what waits for the certified firm, why the kids' window sills matter most; enter photos, GPS/address, year-built evidence, the inventory + disturbance map; sign. The family's claim of a lead-safe renovation = this package: Real, Proven, One-of-one.
What counts as done
- Photo of each peeling/failing paint location, taken from a safe stand-off distance
- Hazard map noting location and rough condition of each spot
- Report reference to the licensed lead-safe assessor named for follow-on work
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Funding this work is a purchase or a vote, same act: you either want this done here, or you want the world to contain it. A vote is free and signed; funding starts at one cent and anything beyond the wage is recorded as a premium for the worker. Either way the money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788183837411_ith6ptc","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.