Anyone can start here · resident homes along the North 10th Street / College Street corridor, Junction, TX 76849 (own-home)
Hand-dig a recharge swale and rain garden.
Fund it for $175. Proof lands onchain when it's done.
$175 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
What the work involvesThis home's roof and yard runoff currently sheets straight off the thin karst soil into the street instead of soaking into the Edwards Aquifer recharge zone, which a hand-dug swale and native planting could slow and hold.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the swale/basin location with the resident, away from the septic field and any buried utility, and photograph the bare site before digging.
- 2. Hand-dig a shallow swale or basin to the design depth at a low point that already collects roof or yard runoff.
- 3. Backfill with amended soil and plant native, water-tolerant Edwards Plateau species at the design spacing.
- 4. Mulch the swale and photograph the finished planting from the matching before vantage, recording species/count and depth.
What counts as done
- Written or recorded permission from the resident
- Before photo of the bare site and grading
- Swale/basin hand-dug to the design depth with a photo showing the measurement
- Native, water-tolerant Edwards Plateau species and count recorded
- After photo showing the finished, mulched swale
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788215150975_mpbq32o","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.