intermediate work · a public county road right of way near Decatur, TX 76234, Wise County (Woodbine-sand seep or sandyland bog segment), or a resident's own rural property with the owner's consent
Restore a Woodbine-sand seep segment near Decatur, site 1, a public county road right of way near Decatur, TX 76234, Wise County (Woodbine-sand seep or sandyland bog segment), or a resident's own rura.
Fund it for $170. Proof lands onchain when it's done.
$170 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
What the work involvesThe survey above found a bare or trampled Woodbine-sand seep or sandyland bog segment near Decatur, and a hand fenced, hand planted native wetland edge would otherwise leave this seep bare and trampled for another season.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the segment with the property owner, or the county road department if on the right of way, and photograph the bare or trampled seep or bog edge before starting, staying on stable ground.
- 2. Hand install a small exclusion fence panel around the seep or bog margin, hand tools only, no power equipment, staying out of the wet ground itself.
- 3. Hand plant native wetland edge species (sedges or rushes) around the fenced margin, staying out of the seep itself.
- 4. Photograph the fenced and planted seep or bog edge from the matching before vantage and record species and plant count.
What counts as done
- Written or recorded permission from the property owner, or confirmation the work stayed on the public road right of way
- Before photo of the bare or trampled seep or bog edge
- Confirmation only hand tools were used, work stayed out of the wet ground itself
- Species and plant count recorded
- After photo of the fenced and planted seep or bog edge from the matching vantage
Proof is measured against these, not judged by taste.
The standard this serves
Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788229689869_pz6yxfs","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.