Document a Truslow Ave home's electrification readiness.
Fund it for $200. Proof lands onchain when it's done.
$200 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesBefore a heat pump or solar array can land on this home, someone must document what the panel and gas appliances actually are -- nobody on this block has that one-page picture yet.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- tablet/clipboard with the readiness checklist
- camera
- tape measure
- flashlight (panel/attic/crawl)
- note on existing HVAC + water-heating fuel and age
- thermal/IR camera (optional, insulation scope)
Steps
- 1. Confirm the address + scope with the owner/occupant and arrange access to the mechanical room, electrical panel, and attic/crawl. Observe-and-document only: no panel or HVAC work.
- 2. Inventory existing space + water heating: fuel (gas/electric/oil/propane), system type + age, ducted vs. ductless suitability, and any combustion appliance present (for later decommission planning by a pro).
- 3. Photograph the electrical panel label: main service amperage, panel make, and count of used vs. spare breaker slots; note obvious constraints (full panel, subpanels, aluminum branch wiring), as inputs for a licensed electrician's load calc, NOT a load calc yourself.
- 4. Record the envelope/insulation baseline: attic/wall/floor insulation presence + approximate R-level where visible, and obvious air-leakage points; use IR imaging if available.
- 5. Assemble a heat-pump readiness summary: what a conversion would likely require (panel capacity, dedicated circuit, ducting/ductless, envelope improvements) as a ranked readiness list, framed as inputs for licensed pros, not a design.
- 6. Enter photos, GPS/address, the inventory, panel observations, insulation baseline, and the ranked readiness list; sign. Route panel/service and combustion-decommission questions to licensed pros.
What counts as done
- Photo of the panel label and breaker schedule (panel interior untouched)
- Nameplate photos of each gas appliance
- Completed readiness checklist naming the licensed-electrician follow-on items
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788236195700_pvjeusc","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.