Repair a heaved sidewalk panel with a permeable finish, Willis Avenue block

Fund it for $720. Proof lands onchain when it's done.

$720 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

What the work involves

Root-heaved, cracked sidewalk panels on Willis Avenue block trip people daily and shed every drop of rain to the gutter. Repairing to ADA grade with a permeable finish fixes the fall hazard and turns the surface into infiltration.

Where
Location on the packet · Open the map
Pay
$720 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
permit + before/after photos + level readings + infiltration water-test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-16
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Measure and photograph the failed panel (lift height, cross-slope, ponding); confirm the right-of-way permit and 811 utility locates before cutting.
  2. Set cones/barricades and a pedestrian detour; all work stays out of the traffic lane.
  3. Remove the failed section using wet-cut dust controls; correct the subgrade or root cause (root-prune only per the city arborist standard).
  4. Place open-graded base and the permeable surface to ADA/PROWAG slope and lippage limits, then verify with level photos and a water-test.

What counts as done

  • Before photos with measured lift/slope readings
  • Permit + 811 locate references
  • After level readings + infiltration water-test video

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788243824153_l1cluw9","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.