advanced work · Sa Elpaso
Add battery storage to the solar home on the 1400 block of El Paso St (public right-of-way + typical residential conditions), San Antonio, TX 78207.
Fund it for $800. Proof lands onchain when it's done.
$800 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesThe house above exports at noon and imports at dusk; a listed battery keeps its own clean generation for the evening peak and rides through summer storm outages.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- UL 9540 listed battery system + mounting hardware per the approved plan
- NEC 706-rated disconnects, overcurrent protection, conduit and labeling
- torque tools + multimeter/clamp meter (licensed electrician)
- approved permit plan set incl. NFPA 855 siting/clearance sheet
Steps
- 1. ASSESS: verify the planned location meets NFPA 855 clearances (egress, separation, temperature range) and the wall/pad can carry the weight; photograph the location and the main panel before work.
- 2. Mount the battery and gateway/inverter per manufacturer torque and clearance specs; anchor seismic where required.
- 3. A licensed electrician runs conduit, lands conductors, installs disconnects/overcurrent protection, and applies NEC 706 labeling per the plan set.
- 4. Commission: energize per the manufacturer checklist, verify charge/discharge operation and backup transfer (if islanding), and register monitoring.
- 5. VERIFY: pass the AHJ inspection; photograph the installed system, clearances, and labels; record the commissioning report and leave the owner the operating guide.
What counts as done
- Location + clearance photos (NFPA 855) before and after
- UL 9540 listing nameplate photo
- Commissioning report (charge/discharge + backup transfer)
- AHJ inspection pass reference
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788250555124_mojpxs1","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.