advanced work · Scioto Greenway Trail at the Main Street Bridge, Franklinton, Columbus OH 43215
Build a curb-cut rain garden feeding the Scioto Greenway, Franklinton.
Fund it for $700. Proof lands onchain when it's done.
$700 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesStreet runoff from the blocks above the Greenway Trail sheets straight into a storm inlet that discharges to the Scioto untreated; a curb-cut rain garden intercepts and infiltrates that runoff before it ever reaches the pipe.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Photograph the curb/street section and confirm the drainage plan (inlet location, basin sizing) against the contributing street area.
- Saw-cut the curb opening per the plan with wet-cut dust control.
- Excavate and grade the basin, backfill with the specified bioretention soil mix, and set the curb-cut inlet stone apron.
- Plant the basin with water-tolerant native species, mulch, and photograph the finished, planted rain garden.
What counts as done
- Before photos of the curb/street section + drainage plan
- Cutting/excavation photos with dust control visible
- Finished, planted rain garden photo + a water-test showing the curb-cut inlet draining into the basin
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788258041750_jwocdzw","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.