advanced work · 5200 block of Wilshire Blvd (public right-of-way + typical residential conditions), Los Angeles, CA 90036
Install rooftop solar on a low-rise residential building, 5200 Wilshire block.
Fund it for $220. Proof lands onchain when it's done.
$220 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesFlat and low-slope residential roofs on this block sit in full Los Angeles sun producing nothing; the LBC Energy Petal is net-positive energy, and rooftop PV is its primary instrument here.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Verify the approved permit plan set against the actual roof (structure, shading, layout) and photograph the roof and main panel before work.
- Install flashed attachments and racking to the structural plan; torque-log every connection and flash every penetration watertight.
- Mount modules and run wiring per NEC 690; a licensed electrician makes and inspects the terminations.
- Commission per the inverter checklist and record initial production.
- Pass the AHJ final inspection, submit utility permission-to-operate, and photograph the finished array, labels and production reading.
What counts as done
- Before photos of roof and main panel
- Attachment torque + flashing log with photos
- AHJ inspection pass + permission-to-operate submission reference
- Photo of the commissioned array and its initial production reading
Proof is measured against these, not judged by taste.
The standard this serves
Living Building Challenge, Energy Petal. The Energy Petal is the Living Building Challenge's boldest promise: a building that makes more energy than it uses, proven over a full year of lights, laundry, and cold mornings. Mastery looks like a house so tight and so carefully tuned that its rooftop panels run the meter backward. Every such house began the same humble way, with someone finding the leaks and sealing them. A packet like this one, a few honest hours of sealing and measuring, is the first rung of that ladder. Buildings become net positive one closed gap at a time.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788292095900_0tdweah","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.