intermediate work · public roads along North 95th Street, Boulder County, CO
Hand-prune the shading stems named.
Fund it for $120. Proof lands onchain when it's done.
$120 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesThe shading measurement named the stems. Cut only those, by hand, from the ground, with Jack's Solar Garden with Colorado State University and the NREL InSPIRE program giving written permission first, and leave every plant that is not shading a module standing, because the ground around Jack's Solar Garden is habitat before it is a maintenance problem. agrivoltaic research plots, pollinator plantings and crop rows under and between the panel rows. Arisings become a brush pile or mulch on site where the owner allows it, so nothing leaves as waste, and the after photo from the same fixed spot proves the shade is gone.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- laptop or tablet with a spreadsheet
- the array's public production dashboard address, or the owner's meter export
- a named public irradiance source such as NREL NSRDB or the nearest public weather station
- the array's published nameplate DC rating and commissioning date
- camera and a GPS phone for the single public-ground photo
Steps
- 1. Record the array's identity: host, address, nameplate DC rating in kW, module count if published, commissioning date, tilt and orientation if published, and the production dashboard address. If no dashboard and no owner meter data exist, stop and publish that as the finding.
- 2. Download the period's measured energy in kilowatt hours at the finest interval the source offers, and record the interval, the time zone and the download date.
- 3. Pull irradiance for the same period and the same location from a named public source, and state whether it is plane-of-array or global horizontal. Never substitute a design assumption for a measurement.
- 4. Compute expected energy from the nameplate rating and the irradiance, then the performance ratio as measured over expected, leaving every input visible in the sheet.
- 5. Name the losses the public record supports: shading, soiling, inverter downtime hours, curtailment. Publish anything you cannot name as unexplained rather than assigning it to a cause.
- 6. Publish the sheet in full with its sources, take one photo of the array from public ground, and anchor the published file's content hash.
What counts as done
- The site owner's written permission naming the plants and the date
- Before and after photos from the same fixed spot the shading measurement used, with GPS and times
- A list of the stems cut, by species where known, and a note of what was deliberately left standing and why
- Where the arisings went: brush pile, chipped mulch on site, or the owner's own collection, named
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788296668306_toh53ww","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.