Anyone can start here · public roads and city parks, Rosemount, Dakota County, MN
Run the watering round and record the volume.
Fund it for $90. Proof lands onchain when it's done.
$90 proposed
This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
What the work involvesSolar-fed irrigation is a claim about water as much as about power, and the only honest version of it counts gallons. Water the planted bed in Rosemount from the garden's existing source, measure what you apply with a bucket count or the garden's own meter, and record the source used on the day. prairie-region ground cover scored against the Minnesota Board of Water and Soil Resources Habitat Friendly Solar standard. Over a season these rounds turn into a real figure for what the pump delivers and what the bed needs, which is the number a school or a grant application never has.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- hand tools: fork, trowel, rake, watering can
- seed or transplants with a named variety and source
- mulch
- a marked bucket or the garden's own meter for measuring applied water
- camera and a GPS phone
Steps
- 1. Confirm the garden steward's permission and record what waters this bed today: an existing solar-powered pump, a mains spigot, hauled water or nothing.
- 2. Photograph the bed and the water source from fixed points, and read the pump's nameplate and array size from outside the equipment, without opening, switching, connecting or touching anything.
- 3. Prepare the bed with hand tools, plant the named varieties at the labeled spacing, and record the variety, the source and the sowing date.
- 4. Water the bed from the garden's existing source, measuring the volume applied with a marked bucket count or the garden's own meter, and record it with the source used on the day.
- 5. Mulch the bed and publish the before and after photographs, the variety and source record, and the applied volume with its measurement method.
What counts as done
- The volume applied, measured by bucket count or the garden's own meter, with the method stated
- The source used on the day: the solar pump, a mains spigot, hauled water or rain, with a photo
- Photos of the bed from the planting packet's fixed points, with the date and any crop stage noted
- The cumulative season total for this bed so far, and the number of rounds it represents
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788297111073_3k0gqpj","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.