intermediate work · public streets, South Platte greenway paths and city parks, Denver, Denver County, CO

Set up a weather based irrigation controller.

Fund it for $150. Proof lands onchain when it's done.

$150 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

What the work involves

Most public irrigation still runs on a clock that has never heard of rain. With the parks authority's written permission, set up a WaterSense labeled weather based controller on a named park in Denver: zones walked and mapped, soil type, slope, plant type and head type recorded per zone, the schedule programmed to the site rather than to the calendar, a rain or soil moisture sensor paired, and the previous schedule saved so the change can be measured. The work is at the controller face and the plug only. No enclosure is opened, no wire is landed, and any wiring change routes to the authority's licensed electrician.

Where
public streets, South Platte greenway paths and city parks, Denver, Denver County, CO · Open the map
Pay
$150 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
written permission, zone map with soil, slope, plant and head type per zone, the old and new schedules side by side, sensor paired, and the model with its WaterSense listing

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-21
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • GPS phone, camera and a measuring wheel or tape
  • public aerial imagery and the agency's landscape plan where one exists
  • twelve months of reference evapotranspiration from the nearest public weather station
  • the site's own water use records or meter readings
  • the WaterSense labeled controller with its manual, and a rain or soil moisture sensor
  • hand tools, mulch and regionally native plants for the conversion rung, with an 811 locate before any digging

Steps

  1. 1. Get written permission from the owning authority, naming the site and the work, before any measurement, programming or planting.
  2. 2. Walk and map the site: irrigated area by landscape type, and for each zone the soil, the slope, the plant type and the head type, photographed as recorded.
  3. 3. Pull twelve months of reference evapotranspiration from the nearest public weather station, name the station and the network, and apply plant factors from a cited source rather than from memory.
  4. 4. Compute the budget volume and set it beside the site's recorded use, labeling where the use figure came from, then state the gap in both volume and percent and one plain sentence on what could explain it.
  5. 5. For a controller packet, save the existing schedule before changing anything, program the new schedule to the zone map, pair the rain or soil moisture sensor, and photograph the old and new schedules side by side. Work at the controller face and an existing outlet only: never open an electrical enclosure and never land a wire.
  6. 6. For a turf conversion, mark the strip, smother or hand lift the turf, loosen the soil, plant regionally native low water species at spacing, and mulch. Then obtain written confirmation from the authority that the zone serving the strip has been shut off or re-programmed by their own staff.
  7. 7. Record the square footage converted and the strip's prior water use, so the saving can be counted next season rather than claimed today.

What counts as done

  • The parks authority's written permission naming the site and the controller, and the controller model with its WaterSense listing or a note that it is not listed
  • A zone map with soil type, slope, plant type and head type recorded per zone, walked and photographed
  • The previous schedule and the new schedule side by side, with the runtime per zone in each
  • The rain or soil moisture sensor installed and paired, photographed in place, with the setting it is configured to

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788300299962_e7n0xy6","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.