intermediate work · public streets, community parks and river bluff overlooks, Memphis, Shelby County, TN

Plant a native riparian buffer on a public bank of the Memphis Sand aquifer and the Mississippi River.

Fund it for $280. Proof lands onchain when it's done.

$280 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

What the work involves

A shaded, rooted bank holds its own water, cools the reach and takes the first flush before it reaches the Memphis Sand aquifer and the Mississippi River. On a public bank or floodplain terrace near Memphis, with the owning authority's written permission and an honored 811 locate, plant a native riparian buffer above the ordinary water line: deep rooted grasses and sedges at the toe, shrubs mid bank, and small trees at the top, mulched, with a first year watering plan and a named steward. Work from the dry bank only; nothing is placed in the channel.

Where
public streets, community parks and river bluff overlooks, Memphis, Shelby County, TN · Open the map
Pay
$280 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
written permission, 811 ticket, GPS polygon with bank length, before and after photos, species list by bank position, and a first year watering plan with a named steward

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-01
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • shovel / dibble bar
  • native bare-root or plug plantings (locally sourced)
  • erosion-control matting or willow stakes (bank-stabilization sites)
  • loppers / hand saw (invasive removal)
  • gloves + trash bags (litter pass)
  • camera
  • GPS-enabled phone

Steps

  1. 1. Walk the reach with the site plan (or the standing bioassessment/watershed-health finding, if one exists) and photograph the bank/buffer segment as found: bare soil, invasive cover, litter, erosion.
  2. 2. Clear invasive growth and litter from the planting zone by hand, bagging trash separately from green waste; leave native volunteers in place.
  3. 3. Plant native riparian species (or set willow stakes / erosion-control matting) at the spacing and depth the site plan calls for, working from the top of bank downward; water each planting in.
  4. 4. Stake or anchor any erosion-control matting so it will not lift in the next high-flow event, and mulch around new plantings kept clear of stems.
  5. 5. Photograph the finished segment from the matching vantage, record species/count or matting area installed, and note any follow-up watering the planting needs.

What counts as done

  • The owning authority's written permission and the 811 locate ticket number, both dated before any digging
  • A GPS polygon of the planted buffer with the bank length and the average width from the ordinary water line
  • Before and after photos from the same vantage, and a species list with counts by bank position, all regionally native, with the nursery source
  • The first year watering plan with the named steward, and the survival check date set for the following season

Proof is measured against these, not judged by taste.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788301204957_2pn0rv4","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.