a single-story community building with a low flat roof suited to a modular green-roof system, Nocona, TX 76255 (Montague County); best-estimate location near the town center, exact address not confirmed
Install a modular vegetated green roof on the community center's low flat roof, Nocona, TX.
This community center's single-story flat roof bakes all summer and drives the building's cooling load with nothing but bare membrane up there Read all of it
Not funded yet. Settles as earned credit, $840 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + fall-protection confirmation + drainage check + GPS
- Open until2026-10-04
- Leveladvanced
All of it: the words, the place, the proof
This community center's single-story flat roof bakes all summer and drives the building's cooling load with nothing but bare membrane up there; a modular tray-based green roof system over that low, code-accessible roof cuts the heat gain and gives the building real insulating cover instead of exposed black membrane.
Fund it for $840. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm roof access, load rating, and fall-protection plan with facilities staff before any work begins; photograph the bare roof membrane as found.
- 2. Set fall-protection anchors or guardrails per the plan before anyone works near a roof edge.
- 3. Lay the modular vegetated trays per the kit's layout, starting from the roof drain and working outward, confirming each tray seats flat and drains correctly.
- 4. Water the newly planted trays in thoroughly and confirm no ponding at the drain.
- 5. Photograph the finished, planted roof from the matching before vantage.
What counts as done
- Before photo of the bare roof membrane
- After photo of the completed, planted modular green roof
- Confirmation of fall-protection setup and drain-clearance check
Proof is measured against these, not judged by taste.
The standard this serves
Energy Efficiency Audit. Energy efficiency work begins with the walkthrough audit, the kind the ASHRAE standard describes: a trained eye moving through a building, reading the bills, the walls, the lights, and the equipment, and coming out with the short list of fixes worth doing first. Mastery looks like an auditor who can feel where a building is bleeding money within the hour, and prove it on paper. That instinct is trained by repetition on real buildings. This packet is one repetition: one system observed, one reading taken, one finding recorded the way the standard asks.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789315301789_hzbt67l","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789315301789_hzbt67l