Los Angeles, CA (community building, exact site not yet named)
Scope a window retrofit.
Measure the single-pane windows at a community building in Los Angeles, CA for a retrofit. Read all of it
Not funded yet. Settles as earned credit, $840 proposed.
Proof it takes, the deadline, the level
- Proofpermit + EPA RRP lead-safe work-practice record + before/after U-factor label photos + flashing/sealant photos + inspection pass
- Open until2026-10-29
- Leveladvanced
All of it: the words, the place, the proof
Measure the single-pane windows at a community building in Los Angeles, CA for a retrofit. They leak heat and street noise, and this scopes a retrofit to efficient units.
Fund it for $840. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- caulk gun + backer rod
- low-expansion spray-foam sealant (fire-rated where required)
- storm window/door kit or rigid-foam rim-joist batts
- heat-tape + pipe-insulation sleeves (freeze-protection runs)
- camera
- tape measure + utility knife
Steps
- 1. Confirm the scope with the occupant/facility manager against the readiness survey's ranked target list (or a fresh walk if none exists); photograph the untreated bypass, window, rim-joist run or pipe run.
- 2. Prep the surface: clean and dry the substrate, remove failed old caulk or weatherstripping, and clear any debris blocking the install.
- 3. Install the sealing/insulation material to the target's spec -- storm window/door, spray-foam bypass seal, rim-joist rigid-foam batt, or heat-tape plus pipe-insulation sleeve -- per manufacturer instructions.
- 4. Verify the result (smoke-pencil/hand check for bypass work, fit-and-lock check for storm windows/doors, continuous-coverage check for rim-joist or pipe insulation) and photograph the finished install from the same vantage.
- 5. Note any combustion-safety or moisture flag surfaced during the install and route it to a BPI-qualified pro before continuing to the next target.
What counts as done
- Before photos of each failed window with visible cracking/fogging/rot
- Permit reference + EPA RRP lead-safe containment record for this pre-1978 building
- NFRC label photo of each installed window (U-factor, SHGC)
- After photos showing flush flashing and sealed, weathertight installation
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789348559451_0miyu7b","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.