Scope rooftop solar.
Measure the roof at a community building in Los Angeles, CA and scope a solar array. Read all of it
Not funded yet. Settles as earned credit, $880 proposed.
Proof it takes, the deadline, the level
- Proofpermit + torque/flash log + inspection pass + production reading photo + GPS
- Open until2026-10-29
- Leveladvanced
All of it: the words, the place, the proof
Measure the roof at a community building in Los Angeles, CA and scope a solar array. The roof gets full sun with no generation at all, and this says what an array would cut from the grid load.
Fund it for $880. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- fall protection (anchored harness) + hard hat + gloves (site PPE)
- PV modules, racking/flashing, inverter(s), conduit and NEC 690-rated disconnects per the approved plan set
- torque wrench + multimeter/clamp meter + irradiance or production-check tool
- approved permit plan set + utility interconnection application
Steps
- 1. ASSESS: verify the approved permit plan set matches the roof (structure, rafter condition, shading, array layout); confirm the main panel rating and the planned interconnection method; photograph existing roof + panel before work.
- 2. Install flashed roof attachments and racking to the structural plan (torque to spec, flash every penetration watertight); document torque checks.
- 3. Mount modules, run conduit/wiring, and land the inverter(s) and NEC 690 disconnects and labels exactly per the plan set; a licensed electrician makes and inspects the electrical terminations.
- 4. Commission: energize per the inverter checklist, measure open-circuit/operating values against design, and record initial production.
- 5. VERIFY: pass the AHJ final inspection and submit utility permission-to-operate; photograph the completed array, labels, and production reading; leave the owner the as-built + warranty packet.
What counts as done
- Before photos of roof and main panel
- Attachment torque + flashing log
- AHJ inspection pass reference
- Commissioned production reading photo
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789348832933_paw0iym","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.