← Board

Masjidul Waritheen West

Scope rooftop solar.

Measure the roof at a community building in Oakland, CA and scope a solar array. Read all of it

Not funded yet. Settles as earned credit, $880 proposed.

Proof it takes, the deadline, the level
  • ProofBefore photos of roof + main panel + Attachment/flashing log with photos + AHJ inspection pass + permission-to-operate reference + Commissioned production-reading photo
  • Open until2026-10-29
  • Leveladvanced
All of it: the words, the place, the proof

Measure the roof at a community building in Oakland, CA and scope a solar array. The roof gets full sun with no generation at all, and this says what an array would cut from the grid load.

Fund it for $880. Proof lands onchain when it's done.

Where
Masjidul Waritheen West, Oakland, CA (community building, exact site not yet named). Open the map
Pay
$880 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Before photos of roof + main panel + Attachment/flashing log with photos + AHJ inspection pass + permission-to-operate reference + Commissioned production-reading photo

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-29
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • fall protection (anchored harness) + hard hat + gloves (site PPE)
  • PV modules, racking/flashing, inverter(s), conduit and NEC 690-rated disconnects per the approved plan set
  • torque wrench + multimeter/clamp meter + irradiance or production-check tool
  • approved permit plan set + utility interconnection application

Steps

  1. 1. ASSESS: verify the approved permit plan set matches the roof (structure, rafter condition, shading, array layout); confirm the main panel rating and the planned interconnection method; photograph existing roof + panel before work.
  2. 2. Install flashed roof attachments and racking to the structural plan (torque to spec, flash every penetration watertight); document torque checks.
  3. 3. Mount modules, run conduit/wiring, and land the inverter(s) and NEC 690 disconnects and labels exactly per the plan set; a licensed electrician makes and inspects the electrical terminations.
  4. 4. Commission: energize per the inverter checklist, measure open-circuit/operating values against design, and record initial production.
  5. 5. VERIFY: pass the AHJ final inspection and submit utility permission-to-operate; photograph the completed array, labels, and production reading; leave the owner the as-built + warranty packet.

What counts as done

  • Before photos of roof + main panel
  • Attachment/flashing log with photos
  • AHJ inspection pass + permission-to-operate reference
  • Commissioned production-reading photo

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789356074272_f3cabst","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1789356074272_f3cabst