Fresno, CA (public right-of-way, exact site not yet named)
Build a vegetated bioswale.
Plant a graded bioswale on the frontage at a public right-of-way in Fresno, CA. Read all of it
Not funded yet. Settles as earned credit, $480 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + planting list + hose-test infiltration video/photo + GPS
- Open until2026-10-29
- Levelintermediate
All of it: the words, the place, the proof
Plant a graded bioswale on the frontage at a public right-of-way in Fresno, CA. The frontage sheds runoff straight to the storm drain during every storm, and the swale slows and filters that flow before it leaves the block.
Fund it for $480. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Grade a shallow, gently sloped channel in the landscape strip from the downspout outlet to the planned overflow point; photograph as found.
- Amend the channel soil for infiltration and line the low point with rock check-dams to slow flow.
- Plant native, water-tolerant grasses and forbs along the swale.
- Test with a hose-run from the downspout and photograph the water infiltrating along the planted channel.
What counts as done
- Before photo of the graded channel
- After photo of the planted, functioning bioswale
- Hose-test confirmation of infiltration
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789357582180_dbcuxx6","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789357582180_dbcuxx6