← Board

Fresno, CA (public right-of-way, exact site not yet named)

Bring the corner curb ramp up to ADA grade.

Bring the corner curb ramp on the public right-of-way in Fresno, CA up to ADA grade. Read all of it

Not funded yet. Settles as earned credit, $840 proposed.

Proof it takes, the deadline, the level
  • Proofslope survey + permit + before/after photos + inspection pass + GPS
  • Open until2026-10-29
  • Leveladvanced
All of it: the words, the place, the proof

Bring the corner curb ramp on the public right-of-way in Fresno, CA up to ADA grade. It predates current ADA geometry, shutting out wheelchair users and families with strollers.

Fund it for $840. Proof lands onchain when it's done.

Where
Fresno, CA (public right-of-way, exact site not yet named). Open the map
Pay
$840 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
slope survey + permit + before/after photos + inspection pass + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-29
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Survey the existing ramp slope, cross-slope and landing against ADA/PROWAG R304 and photograph as found.
  2. Saw-cut and remove the non-compliant ramp section.
  3. Form and pour a compliant ramp with correct slope, landing and detectable warning surface per the permit plan.
  4. Cure, inspect against the AHJ checklist, and photograph the finished, compliant ramp.

What counts as done

  • Slope survey readings before
  • Permit reference
  • Before/after photos + inspection pass confirmation

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789357634265_fzo75np","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1789357634265_fzo75np