Seattle, WA (public right-of-way, exact site not yet named)
Repair the sidewalk with a permeable finish.
Repair the sidewalk with a permeable finish in Seattle, WA. Read all of it
Not funded yet. Settles as earned credit, $720 proposed.
Proof it takes, the deadline, the level
- Proofpermit + before/after level readings + infiltration test video + GPS
- Open until2026-10-29
- Leveladvanced
All of it: the words, the place, the proof
Repair the sidewalk with a permeable finish in Seattle, WA. This packet does not assert a surveyed condition beyond that. The proof requirements listed on this packet are what counts as done.
Fund it for $720. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Measure and photograph the failed panel (lift height, cross-slope, ponding); confirm the right-of-way permit and 811 utility locates before any cutting.
- Set cones/barricades and a pedestrian detour; all work stays out of the traffic lane.
- Remove the failed section using wet-cut dust controls; correct the subgrade or root cause (root-prune only per the city arborist standard).
- Place open-graded base and the permeable surface to ADA/PROWAG slope and lippage limits.
- Verify cross-slope ≤2% and lippage ≤1/4 inch with level photos, water-test infiltration, and close out the permit.
What counts as done
- Before photos with measured lift/slope readings
- Permit + 811 locate references
- After level readings (cross-slope ≤2%, lippage ≤1/4 in) + infiltration water-test video
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789358916946_tp3h7x2","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789358916946_tp3h7x2