Install a Level-2 EV charger, Home on Julian St (1100 block), Westwood.

Westwood's Morrison Road corridor runs on cars, and this Julian St home's driveway has zero charging; a Level-2 charger is the Energy Read all of it

Not funded yet. Settles as earned credit, $800 proposed.

Proof it takes, the deadline, the level
  • Proofpermit + inspection pass + commissioning photos + GPS
  • Open until2026-10-29
  • Leveladvanced
All of it: the words, the place, the proof

Westwood's Morrison Road corridor runs on cars, and this Julian St home's driveway has zero charging; a Level-2 charger is the Energy Petal's transport edge for a household ready to go electric.

Fund it for $800. Proof lands onchain when it's done.

Where
Ww, 1100 Julian St, Westwood, Denver, CO 80219. Open the map
Pay
$800 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
permit + inspection pass + commissioning photos + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-29
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Run/verify the service load calculation, confirm panel capacity and the conduit path, and photograph the panel schedule and driveway/garage location before work.
  2. Install the branch circuit (conduit, conductors, breaker) sized per the EVSE nameplate and NEC 625; torque and log terminations.
  3. Mount and wire the listed EVSE at the required height with cable management; label the circuit.
  4. Commission: verify voltage, protection function, and a full charge session; register networked units.
  5. Pass the electrical inspection and photograph the finished install, breaker and labels.

What counts as done

  • Before photos of the roof/panel/driveway as applicable
  • Commissioning record (production, charge/discharge, or charge session as applicable)
  • Permit + AHJ/electrical inspection pass reference
  • After photos of the finished, labeled installation

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789359164431_zjbqlp1","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.