Add battery storage behind the new solar array.
The fresh solar array at 13737 Mapleridge exports at noon and the home imports again by dusk; a listed battery keeps that Read all of it
Not funded yet. Settles as earned credit, $800 proposed.
Proof it takes, the deadline, the level
- Proofpermit + UL 9540 nameplate photo + commissioning report + inspection pass + GPS
- Open until2026-10-29
- Leveladvanced
All of it: the words, the place, the proof
The fresh solar array at 13737 Mapleridge exports at noon and the home imports again by dusk; a listed battery keeps that generation for the evening and rides through Detroit's winter outages.
Fund it for $800. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- UL 9540 listed battery system + mounting hardware per the approved plan
- NEC 706-rated disconnects, overcurrent protection, conduit and labeling
- torque tools + multimeter/clamp meter (licensed electrician)
- approved permit plan set incl. NFPA 855 siting/clearance sheet
Steps
- 1. ASSESS: verify the planned location meets NFPA 855 clearances (egress, separation, temperature range) and the wall/pad can carry the weight; photograph the location and the main panel before work.
- 2. Mount the battery and gateway/inverter per manufacturer torque and clearance specs; anchor seismic where required.
- 3. A licensed electrician runs conduit, lands conductors, installs disconnects/overcurrent protection, and applies NEC 706 labeling per the plan set.
- 4. Commission: energize per the manufacturer checklist, verify charge/discharge operation and backup transfer (if islanding), and register monitoring.
- 5. VERIFY: pass the AHJ inspection; photograph the installed system, clearances, and labels; record the commissioning report and leave the owner the operating guide.
What counts as done
- Location + clearance photos (NFPA 855) before and after
- UL 9540 listing nameplate photo
- Commissioning report (charge/discharge + backup transfer)
- AHJ inspection pass reference
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789359448597_2v3s981","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.