Detroit, MI (community building, exact site not yet named)
Clear and repair the gutters and downspouts.
Clear and repair the gutters and downspouts at a community building in Detroit, MI. Read all of it
Not funded yet. Settles as earned credit, $220 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos of the gutter run + downspout discharge point + GPS
- Open until2026-10-29
- Levelentry
All of it: the words, the place, the proof
Clear and repair the gutters and downspouts at a community building in Detroit, MI. They are clogged and separated, dumping roof runoff down the walls instead of away. Clearing and repairing them protects the building.
Fund it for $220. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- camera
- gutter scoop or hose wand, bucket and tarp
- ladder or elevated platform appropriate to the height, plus the fall protection the building's rules require and a spotter
- caulk gun with exterior-rated sealant and patching compound
- rake, tarp and waste bags
- tape measure and a 4-ft level for grading
- gloves and safety glasses
Steps
- 1. Confirm the scope and the access rules with the facility manager BEFORE starting: where ladders may be set, whether the work is above an entrance or a walkway that must be closed off, whether a permit or a contractor induction is required, and who to call if something is found. An institutional building has rules about working at height that a house does not, and they are not waivable on site.
- 2. Photograph the gutter run, downspouts, perimeter debris and any envelope gap or grading problem as found, from the vantage points that will be used again afterwards.
- 3. Confirm the building's condition constraints: post-1978, or pre-1978 with intact, unpainted-substrate work only. Any disturbed pre-1978 paint STOPS this scope and routes to an EPA-certified firm, and in a building children use that determination is made before a tool is picked up.
- 4. Cone off or otherwise protect the work zone below, then clear debris from the gutters and confirm the downspouts drain freely and discharge clear of the foundation and away from any walkway or entrance where discharge would create a slip hazard. Re-secure loose hangers within reach.
- 5. Clear accumulated debris from the building perimeter, entrances and walkways so drainage paths and pest-entry points stay clear, and bag or stage waste for the building's own collection arrangement rather than leaving it at the kerb.
- 6. Patch and seal small envelope gaps at trim, soffit and utility penetrations with exterior-rated sealant, and regrade a short run of soil away from the foundation where it currently slopes toward it.
- 7. Verify: gutters run clear water end to end, downspouts discharge away from the foundation and away from walking surfaces, patched gaps are weathertight, and the perimeter is clear. Photograph the finished work from the same vantages as the before photos, and reopen any area that was closed off.
- 8. Enter before and after photos, materials used, and every hazard found (active leak, structural rot, suspected lead paint, an unsafe roof edge) into the proof record and report them to the facility manager; sign.
What counts as done
- Before photo of the clogged gutter and downspout
- After photo of the cleared run from the same vantage
- Photo confirming the downspout discharges toward the rain garden inlet
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789359608231_o2ntdxx","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required, regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789359608231_o2ntdxx