Los Angeles, CA (public right-of-way, exact site not yet named)
Build a community bulletin kiosk.
Install an anchored community bulletin kiosk on the frontage in Los Angeles, CA. Read all of it
Not funded yet. Settles as earned credit, $560 proposed.
Proof it takes, the deadline, the level
- Proof811 locate confirm + before/after photos + anchor-torque check + weatherproof-glazing/latch check + GPS
- Open until2026-10-29
- Levelintermediate
All of it: the words, the place, the proof
Install an anchored community bulletin kiosk on the frontage in Los Angeles, CA. The frontage has no posting board for schedules and neighborhood-hazard notices, and a built kiosk gives the block one.
Fund it for $560. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- the published plan set + building or parks permit + the 811 utility-locate confirmation
- framing lumber or the kit package, specified fasteners, and post bases or footing hardware
- circular saw, drill/driver, post-hole tool, and a mixing tub for footing concrete
- 4-ft level, square, tape measure, string line
- eye and hearing protection, gloves, dust mask for cutting
- exterior finish (paint, stain or sealant) rated for the exposure
- camera + GPS phone
Steps
- 1. ASSESS: photograph the site as found, confirm the permit and the plan cover this footprint, and confirm the 811 locate is honored before any digging.
- 2. Set out the footprint to the plan dimensions and check it against the accessible route and any sight-line requirement the parks department set.
- 3. Dig and set the footings or post bases to the plan depth; check plumb and diagonal square before the concrete sets.
- 4. Frame the structure to the plan, fastening at the specified pattern; keep every cut edge sealed and every fastener recessed or covered so no sharp edge is left in public reach.
- 5. Fit the weatherproofing (roof, glazing, door or latch) and confirm it sheds water away from the structure and the walking surface.
- 6. VERIFY: level and plumb readings on the finished structure, latch and door operation, and a check that nothing protrudes into the accessible route.
- 7. Photograph the finished build from the before vantage, log the permit and inspection reference, and enter both in the proof record.
What counts as done
- Before photo of the bare frontage with no posting surface
- 811 locate reference before any anchor drilling
- After photo of the installed, level, securely anchored kiosk with weatherproof glazing
- Latch/door function check confirmed working
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789359933843_1dlxum5","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.