← Board

Leimert Park Village, 43rd Pl & Degnan Blvd, Los Angeles, CA 90008

Build a curb-extension bioretention bulb-out, corner 2 -- Leimert Park Village, 43rd Pl & Degnan Blvd, Los Angeles, CA 90008.

Cut and plant a curb-extension bioretention bulb-out at corner 2, Leimert Park Village in Los Angeles, CA. Read all of it

Not funded yet. Settles as earned credit, $1,040 proposed.

Proof it takes, the deadline, the level
  • Proofpermit + before/after photos + curb-cut/grading spec + native-plant list + infiltration water-test video + GPS
  • Open until2026-11-15
  • Leveladvanced
All of it: the words, the place, the proof

Cut and plant a curb-extension bioretention bulb-out at corner 2, Leimert Park Village in Los Angeles, CA. The inspection is expected to find this village corner's oversized curb radius sheds runoff straight past the curb with no capture, while giving pedestrians a longer, less-shaded crossing; one build shortens the crossing and captures the runoff.

Fund it for $1,040. The receipt lands onchain once the proof is approved.

Where
Leimert Park Village, 43rd Pl & Degnan Blvd, Los Angeles, CA 90008. Open the map
Pay
$1,040 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
permit + before/after photos + curb-cut/grading spec + native-plant list + infiltration water-test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-11-15
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Trained crew only: right-of-way permit, 811 locates, wet-cut dust controls (respirable silica), traffic control and pedestrian detour maintained through construction; never work from the open travel lane. Wear a hi-vis vest near traffic.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Record the right-of-way permit and 811 locate references before curb work.
  2. Photograph the oversized, unplanted curb corner before work.
  3. Prepare the curb cut and record the engineered-soil and grading specification for the bulb-out footprint.
  4. Record the native plant species and counts, then plant the graded bulb-out.
  5. Photograph the planted bulb-out and record an infiltration water-test video showing drainage within 24-48 hours.
  6. Save GPS for the completed corner.

What counts as done

  • Before photo of the oversized, unplanted curb corner
  • Permit + 811 locate references before any curb cutting or excavation
  • Curb-cut and engineered-soil grading spec matched to the bulb-out footprint
  • After photo of the planted bulb-out + infiltration water-test video showing drainage within 24-48 hours

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1789566356798_xw5tkis