← Board

the Main Street corridor, Chadron, NE 69337

Build walk-in cold storage.

A licensed crew builds an insulated walk-in cold storage room at the Main Street corridor, wiring the compressor and sealing the door for a steady temperature. Read all of it

Not funded yet. Settles as earned credit, $980 proposed.

Proof it takes, the deadline, the level
  • Proofpermit + panel/compressor spec sheet + electrical inspection reference + before/after photos + first-week temperature log
  • Open until2026-11-15
  • Leveladvanced
All of it: the words, the place, the proof

Build walk-in cold storage at the town's food hub, the Main Street corridor, Chadron, NE 69337. This Panhandle food hub distributes donated produce and locally raised meat to ranch families across a wide rural service area but has no cold storage, so a real share of every delivery spoils before it reaches a shelf; a built walk-in cold-storage unit is the direct structure-scale fix.

Fund it for $980. The receipt lands onchain once the proof is approved.

What it looks like
A licensed crew builds an insulated walk-in cold storage room at the Main Street corridor, wiring the compressor and sealing the door for a steady temperature.

A description of this kind of work, not a record that it happened here.

Where
the Main Street corridor, Chadron, NE 69337. Open the map
Pay
$980 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
permit + panel/compressor spec sheet + electrical inspection reference + before/after photos + first-week temperature log

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-11-15
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Licensed refrigeration and electrical trades only, with EPA 608 refrigerant handling where applicable. Never run the unit until the permit is pulled and the electrical inspection passes.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Confirm the pulled electrical permit and photograph the food hub's unrefrigerated storage space as found.
  2. Set the electrical panel and compressor per the spec sheet for the walk-in unit.
  3. Build and insulate the walk-in cold-storage enclosure at the food hub this job's title names.
  4. Connect the compressor and confirm the electrical inspection passes before the unit runs.
  5. Seal the walk-in unit's door and confirm the seal holds.
  6. Photograph the completed walk-in unit with its door seal confirmed.
  7. Run the unit and log its temperature daily for the first week, confirming it holds between 34 and 40 degrees Fahrenheit.
  8. Record the panel/compressor spec sheet, the electrical permit reference and the first-week temperature log as the completed proof.

What counts as done

  • Before photo of the unrefrigerated storage space
  • Panel/compressor spec sheet + electrical permit reference
  • After photo of the completed walk-in unit with door seal confirmed
  • First-week temperature log holding within the target range (34-40F for produce/meat)

Proof is measured against these, not judged by taste.

The standard this serves

Food Sustainability, Green Star Scorecard. Food sustainability, as the Michelin Green Star frames it, is a whole kitchen examined honestly across seven fronts: where the food comes from, what gets wasted, what the stoves and coolers burn, how water is used, how things are bought, whether the menu follows the seasons, and how the team is treated. Mastery looks like a restaurant that could open its books on all seven and be proud. Scorecards like that are filled in one observed fact at a time. This packet gathers some of those facts, plainly and without flattery.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1789582563081_z6g0njl