← Board

Bigley Ave, Charleston, WV

Clear the storm drains along Bigley Avenue.

Storm drains along Bigley Avenue fill with debris between cleanings, and when they back up, runoff pools across the sidewalk instead of Read all of it

Not funded yet. Settles as earned credit, $200 proposed.

Proof it takes, the deadline, the level
  • ProofPhoto of each cleared drain with debris volume logged
  • Open until2026-10-18
  • Levelintermediate
All of it: the words, the place, the proof

Storm drains along Bigley Avenue fill with debris between cleanings, and when they back up, runoff pools across the sidewalk instead of draining. Clearing them keeps the corridor passable through the next storm.

Fund it for $200. Proof lands onchain when it's done.

Where
Bigley Ave, Charleston, WV. Open the map
Pay
$200 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Photo of each cleared drain with debris volume logged

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-18
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Locate each drain inlet along Bigley Avenue
  2. Clear grates of leaves, litter, and blockage by hand
  3. Check the outlet pipe for a clear flow path
  4. Bag and remove all cleared debris
  5. Photograph each cleared drain and log the volume removed

What counts as done

  • Before and after photo per drain
  • Debris weight or bag count logged
  • GPS tag on each site

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789702902275_lh94bo4","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1789702902275_lh94bo4