Alta Gracia Tajamar Ar Cba
Destapar las bocas de tormenta, el Tajamar de Alta Gracia (clear the storm drain inlets).
Las bocas de tormenta alrededor del Tajamar se tapan y el agua se junta en la esquina en cada tormenta. Read all of it
Not funded yet. Settles as earned credit, $100 proposed.
Proof it takes, the deadline, the level
- Prooffotos antes/despues por reja + conteo + peso del material + prueba de entrada de agua
- Open until2026-10-18
- Levelintermediate
All of it: the words, the place, the proof
Las bocas de tormenta alrededor del Tajamar se tapan y el agua se junta en la esquina en cada tormenta. Las rejas de captacion estan tapadas de hojas, tierra y envases, y en la primera tormenta fuerte el agua se junta en la esquina en vez de entrar. EN: The storm inlets around the Tajamar clog and water ponds at the corner in every storm. The inlet grates are packed with leaves, soil and packaging, and in the first heavy storm the water ponds at the corner instead of entering.
Fund it for $100. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Fotografiar cada reja tapada y numerarla antes de tocarla. EN: Photograph and number each blocked grate before touching it.
- Retirar con pinza y rastrillo el material acumulado sobre la reja y en los treinta centimetros de borde. EN: Rake and grab the material off the grate and from the thirty centimetres of surrounding gutter.
- Separar el material en residuo seco y organico y llevarlo al punto de disposicion acordado. EN: Separate the material into dry waste and organics and take it to the agreed disposal point.
- Verter un balde de agua sobre la reja limpia y confirmar que entra sin remanso. EN: Pour a bucket of water over the cleared grate and confirm it enters without ponding.
What counts as done
- Foto antes y despues de cada reja, numerada. EN: Before and after photo of each grate, numbered.
- Peso o volumen del material retirado y su destino. EN: Weight or volume of material removed and its destination.
- Prueba de entrada de agua en cada reja despejada. EN: Water-entry test at each cleared grate.
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789704799339_rezhhzg","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789704799339_rezhhzg