← Board

Expired

Storm drains near E 25th St N & N Erie Ave, Wichita, KS 67214

Stencil 'drains to Chisholm Creek' markers on north Wichita storm drains.

In a hi-vis vest, a worker sweeps the curb face and stencils a warning at Storm drains near E 25th St N & N Erie Ave that the drain reaches Chisholm Creek. Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Stencil 'drains to Chisholm Creek' markers on north Wichita storm drains. North Wichita's street drains run to Chisholm Creek and on to the Arkansas River, but the drains are unmarked and treated like utility sinks. A curb stencil at each drain teaches the block permanently, one sentence at a time.

This one lapsed at $160. Similar work is open on the board.

What it looks like
In a hi-vis vest, a worker sweeps the curb face and stencils a warning at Storm drains near E 25th St N & N Erie Ave that the drain reaches Chisholm Creek.

A description of this kind of work, not a record that it happened here.

Where
Storm drains near E 25th St N & N Erie Ave, Wichita, KS 67214. Open the map
Pay
$160 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
photo of each stenciled drain plus the route log

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Lapsed
2026-11-17
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

No special training is needed. Work curb-side by daylight in a high-visibility vest; never step into the travel lane and do not open or reach into any drain; wear eye protection and gloves; read each paint's label and Safety Data Sheet before use.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Confirm the marking route and stencil kit with the city stormwater program.
  2. Sweep and dry the curb face at each drain.
  3. Apply the stencil with approved curb paint.
  4. Log each marked corner.
  5. Photograph each finished stencil, GPS-tagged and dated.

What counts as done

  • Photo of every stenciled drain
  • Route sheet of corners
  • GPS coordinates and date

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1789707858373_fewa21q