Storm drain outfall, curb above canyon rim, Colonia Sánchez Taboada, Tijuana, Baja California 22203

Install a trash-capture screen.

A worker anchors a trash-capture screen to the storm-drain outfall at Storm drain outfall using rated hardware, working from dry pavement. A water test afterward shows the screen catching debris without pooling in the canyon. Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Install a trash-capture screen at the storm drain outfall above the canyon in Tijuana, working from dry pavement. Street trash from Tijuana's hillside colonias washes into storm drains that empty directly into Los Laureles Canyon and, eventually, the Tijuana River Estuary, a well-documented cross-border pollution path. This work never touches the canyon channel itself.

This one lapsed at $240. Similar work is open on the board.

What it looks like
A worker anchors a trash-capture screen to the storm-drain outfall at Storm drain outfall using rated hardware, working from dry pavement. A water test afterward shows the screen catching debris without pooling in the canyon.

A description of this kind of work, not a record that it happened here.

Where
Storm drain outfall, curb above canyon rim, Colonia Sánchez Taboada, Tijuana, Baja California 22203. Open the map
Pay
$240 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
Photo of the anchored trash-capture screen at the outfall

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Lapsed
2026-11-17
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Work only from dry pavement or curb at the outfall mouth; never enter the canyon channel or any flowing water. Stand off if flow is present; check for buried utilities before digging; never handle sharps by hand.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Confirm the drain outfall is dry and accessible from the street or curb.
  2. Measure the outfall opening for the capture screen.
  3. Anchor the screen frame to the outfall using rated hardware, working from dry pavement only.
  4. Test that water still passes through the screen without pooling.
  5. Photograph the installed screen and record the install date.

What counts as done

  • Photo of the outfall before install
  • Photo of the anchored screen
  • GPS-tagged date

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1789708050185_9y565gt