Cudahy, CA (community building, exact site not yet named)
Depave and plant the pocket green space on the schoolyard.
A trained crew member wet-cuts the pavement with a saw inside a fenced-off section of the schoolyard at the site, clearing room for a planted pocket green. Read all of it
Not funded yet. Settles as earned credit, $950 proposed.
Proof it takes, the deadline, the level
- Proofpermit + before/after photos + saw-cut/removal spec + soil-fill/grading log + native-plant list + GPS
- Open until2026-11-21
- Leveladvanced
All of it: the words, the place, the proof
Remove the pavement and plant the pocket green space on the schoolyard in Cudahy, CA. This packet does not assert a surveyed condition beyond that, and the proof requirements listed on it are what counts as done. Name the exact site and confirm it with its host before you claim: this listing gives only the area. A marked section of the schoolyard is paved over, with no planted green space.
Offer to pay $950. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Trained crew only: LAUSD facilities/right-of-way permit, 811 locates, wet-cut dust controls (respirable silica), work scheduled outside school hours, and the section fenced off during demolition. District sign-off precedes work, and never touch the pavement before the permit and 811 locates are confirmed.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Get the district facilities/right-of-way permit and confirm the 811 utility locate marks for the schoolyard named in this job's title before touching the pavement.
- Photograph the paved section targeted for depaving before any work begins.
- Fence off the work zone and schedule the cut-and-remove work for a time outside school hours.
- Saw-cut and remove the marked pavement section, then haul the debris to disposal and log the disposal record.
- Fill and grade the opened section with engineered soil to the depths and slopes set in the fill/grading log.
- Plant the graded bed with the native or adapted plant list assembled for the site.
- Run a water test on the planted section and record it on video, confirming the bed drains within 24 to 48 hours.
- Photograph the completed planted section and record the site's exact name, street address, and the contact who agreed to the work.
What counts as done
- Before photo of the paved section targeted for depaving
- Permit + 811 locate references before any saw-cutting or excavation
- Saw-cut/removal spec and hauled-debris disposal record
- Engineered-soil fill and grading log + native/adapted plant list
- After photo of the planted section + infiltration water-test video showing drainage within 24-48 hours
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.