← Board

Expired

Hill County Courthouse, 1 N Waco St, Hillsboro, TX 76645 (public right-of-way / courthouse square)

Retrofit missing detectable-warning domes onto a curb ramp near the Hill County Courthouse Square, Hillsboro, TX.

A licensed crew in hi-vis wet-cuts anchor holes in the concrete curb ramp at Hill County Courthouse, then anchors a detectable warning dome panel flush and level at its base. Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Retrofit missing detectable-warning domes onto a curb ramp near the Hill County Courthouse Square, Hillsboro, TX. A curb ramp near the courthouse square is structurally sound but was never fitted with the ADA PROWAG-required detectable-warning dome surface, leaving no tactile cue for a visually-impaired pedestrian at the street edge.

This one lapsed at $210. Similar work is open on the board.

What it looks like
A licensed crew in hi-vis wet-cuts anchor holes in the concrete curb ramp at Hill County Courthouse, then anchors a detectable warning dome panel flush and level at its base.

A description of this kind of work, not a record that it happened here.

Where
Hill County Courthouse, 1 N Waco St, Hillsboro, TX 76645 (public right-of-way / courthouse square). Open the map
Pay
$210 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
before/after photos + dome-panel spec sheet + anchor-set photo + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Lapsed
2026-11-08
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Licensed concrete/ADA-retrofit crew only; wet-cut anchor holes to control dust; cones/hi-vis during install and cure time. Wear eye protection and hearing protection; get flagger training and an approved traffic control plan before any work in the roadway.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. Set cones and hi-vis around the ramp before starting.
  2. 2. Photograph the ramp before, with no detectable-warning surface present.
  3. 3. Anchor a PROWAG-compliant detectable-warning panel flush and level at the base of the ramp, wet-cutting any anchor holes to control dust.
  4. 4. Photograph the finished, anchored dome surface after cure time.

What counts as done

  • Before photo of the ramp with no detectable-warning surface
  • Spec sheet/photo of the PROWAG-compliant detectable-warning panel used
  • Photo of the panel anchored flush and level at the ramp's base
  • After photo of the finished, anchored dome surface

Proof is measured against these, not judged by taste.

The standard this serves

Civic Safety Reporting. Civic safety is the craft of noticing for your neighbors: the burned-out light over a dark corner, the sidewalk lip waiting to trip someone, the overgrown hedge hiding a crosswalk. This standard is documentation and coordination only, no repairs: see the hazard clearly, grade how serious it is, record it with a photo and a place, and route it to the people with the authority to fix it. Mastery looks like a neighborhood where problems are found while they are still small. This packet is one clear-eyed report, and one clear report is how every fix begins.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1790239568304_ldznep6