← Board

At home / Flint, MI (any household, priority for pre-1986 plumbing or suspected lead service line)

Household lead-in-water screen, first-draw + flushed (certified lab) — Flint, MI.

Collect a paired first-draw and flushed water sample for a certified-lab lead test in Flint. Read all of it

Not funded yet. Settles as earned credit, $140 proposed.

Proof it takes, the deadline, the level
  • ProofFirst-draw, flushed lead results collected per lab protocol + Signed chain of custody recorded + Results compared only to EPA action-level framing + Utility lead-service-line status queried + Every finding routed per the iron law
  • Open until2027-01-22
  • Levelentry
All of it: the words, the place, the proof

Collect a paired first-draw and flushed water sample for a certified-lab lead test in Flint. This city's own 2014 water-source change is the documented reason a paired first-draw/flushed sample and a utility lead-service-line check matter more here than almost anywhere else in the country.

Fund it for $140. Proof lands onchain when it's done.

Where
At home / Flint, MI (any household, priority for pre-1986 plumbing or suspected lead service line). Open the map
Pay
$140 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
First-draw, flushed lead results collected per lab protocol + Signed chain of custody recorded + Results compared only to EPA action-level framing + Utility lead-service-line status queried + Every finding routed per the iron law

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2027-01-22
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • The certified laboratory's lead sampling kit (separate bottles for first-draw and flushed samples)
  • A tap that has NOT been used for at least 6 hours before first-draw sampling (per standard protocol)
  • Chain-of-custody form
  • Household plumbing age/type records if known (year built, known pipe material, known lead service line status)

Steps

  1. 1. Confirm eligibility for urgent-priority screening: home built before 1986 (lead solder ban), a known or suspected lead service line, or a child under 6 / pregnant person in the household.
  2. 2. Contact the local water utility to ask directly whether a lead service line serves the property (many utilities maintain a public lead service line inventory/map under current EPA rule requirements).
  3. 3. Following the certified lab's kit instructions exactly, collect a FIRST-DRAW sample after the required non-use period (no flushing, first water out of the tap).
  4. 4. Following the same kit's instructions, collect a FULLY FLUSHED sample after running the tap for the lab-specified flush time.
  5. 5. Complete the chain-of-custody form noting the collection tap, non-use period, and any known plumbing/service-line facts.
  6. 6. Record the lab's reported first-draw and flushed lead results once received, in micrograms/L (ppb), with the lab's name and certification.
  7. 7. Compare both results only to EPA's action-level framing (currently 15 ppb at the system level; EPA is proposing 10 µg/L) — record the comparison, never a household 'safe' verdict, and route per the decision rules.

What counts as done

  • Certified laboratory named, with first-draw and flushed samples collected per its own kit instructions and a signed chain-of-custody form
  • Local water utility contacted (or contact attempt recorded) regarding lead service line status at the property
  • Both lead results reported in ug/L (ppb) with the lab's name/certification, compared explicitly to EPA's action-level framing; no household 'safe' verdict written
  • Pre-1986 plumbing status and any known service-line material recorded as context
  • Any elevated result, or any household with a child under 6 or a pregnant person, routed per the decision rules

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790274627258_b8hnxw5","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1790274627258_b8hnxw5