Stephenville City Park, 378 W Long St, Stephenville, TX 76401 (public City of Stephenville park with the Splashville splash pad and pool, best-estimate location near the confirmed address), low corner drainage exit
Build a bioretention cell.
Every storm at Stephenville City Park (Splashville) sheds its own first flush, the summer’s oil, brake dust and litter, straight off the Read all of it
Not funded yet. Settles as earned credit, $900 proposed.
Proof it takes, the deadline, the level
- Proofphoto of the curb cut and finished cell + drainage-area note + test-pour confirmation + named licensed contractor and crew
- Open until2026-11-09
- Leveladvanced
All of it: the words, the place, the proof
Every storm at Stephenville City Park (Splashville) sheds its own first flush, the summer’s oil, brake dust and litter, straight off the low corner of the lot and off the property with nothing to slow or filter it before it reaches the storm drain; this is the lot’s own runoff, sized to the lot’s own paved acreage, not a street or a median.
Fund it for $900. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. A licensed civil or paving contractor identifies the lot’s actual low corner, confirms the drainage area sized to this lot’s own paved acreage, and honors an 811 utility locate before any cutting.
- 2. The contractor saw-cuts a curb opening at the low corner sized to the confirmed flow, coordinated with the site owner’s facilities or public works department and any required permit.
- 3. A trained landscape or GSI-install crew grades a shallow depression behind the opening, amends the soil for infiltration, and plants native, salt- and oil-tolerant bioretention species.
- 4. The crew mulches the cell, confirms the opening drains freely into it with a test pour, and photographs the finished cell with the curb cut and the lot’s low corner both visible in frame.
What counts as done
- Written or recorded permission from the site owner and any required municipal permit reference
- GPS waypoint at the low-corner curb cut
- Photo of the finished curb cut and planted cell with the lot’s low corner visible
- Confirmation that the cell’s size was matched to this specific lot’s own paved drainage area, not a generic size
- Test-pour confirmation that water from the cut drains into the cell rather than pooling in the drive aisle
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790298955981_2b0t39x","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required, regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790298955981_2b0t39x