← Board

Expired

Comanche City Pool and City Park, 1200-1202 Comanche Trail, Comanche, TX 76442 (public City of Comanche park and pool, best-estimate location near the confirmed address), low corner drainage exit

Build a bioretention cell.

Every storm at Comanche City Pool and City Park sheds its own first flush, the summer’s oil, brake dust and litter, straight Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Every storm at Comanche City Pool and City Park sheds its own first flush, the summer’s oil, brake dust and litter, straight off the low corner of the lot and off the property with nothing to slow or filter it before it reaches the storm drain; this is the lot’s own runoff, sized to the lot’s own paved acreage, not a street or a median.

This one lapsed at $900. Similar work is open on the board.

What it looks like
A licensed contractor wearing hi-vis cuts a curb opening with a saw at the low corner of the lot at Comanche City Pool and City Park.

A description of this kind of work, not a record that it happened here.

Where
Comanche City Pool and City Park, 1200-1202 Comanche Trail, Comanche, TX 76442 (public City of Comanche park and pool, best-estimate location near the confirmed address), low corner drainage exit. Open the map
Pay
$900 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
photo of the curb cut and finished cell + drainage-area note + test-pour confirmation + named licensed contractor and crew

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Lapsed
2026-11-09
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

This work happens entirely inside the curbed footprint of the parking island itself, never in a drive aisle or a marked stall; hi-vis is worn, and the two adjacent stalls are coned off or the visit happens when the lot is empty (early morning, before opening, or after close). Texas summer sun-heated asphalt and parked-car pavement can reach temperatures that burn bare skin within seconds and will kill new roots on contact; all outdoor work at this lot happens in early morning or evening, closed-toe shoes and gloves are worn at all times, and no bare hand or plant root ever touches sun-heated pavement directly. Hydration and shade breaks are taken every 20 minutes in the heat. The water reaching this inlet is lot runoff carrying oil, brake dust and litter, not clean water; all clearing happens with gloved hands from the dry inlet edge, and any standing water already pooled in the cell is left undisturbed for it to infiltrate on its own. Saw-cutting or breaking the curb is contractor work only, performed by a licensed civil or paving crew, never an entry-level task; 811 utility locate is confirmed clear first.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. A licensed civil or paving contractor identifies the lot’s actual low corner, confirms the drainage area sized to this lot’s own paved acreage, and honors an 811 utility locate before any cutting.
  2. 2. The contractor saw-cuts a curb opening at the low corner sized to the confirmed flow, coordinated with the site owner’s facilities or public works department and any required permit.
  3. 3. A trained landscape or GSI-install crew grades a shallow depression behind the opening, amends the soil for infiltration, and plants native, salt- and oil-tolerant bioretention species.
  4. 4. The crew mulches the cell, confirms the opening drains freely into it with a test pour, and photographs the finished cell with the curb cut and the lot’s low corner both visible in frame.

What counts as done

  • Written or recorded permission from the site owner and any required municipal permit reference
  • GPS waypoint at the low-corner curb cut
  • Photo of the finished curb cut and planted cell with the lot’s low corner visible
  • Confirmation that the cell’s size was matched to this specific lot’s own paved drainage area, not a generic size
  • Test-pour confirmation that water from the cut drains into the cell rather than pooling in the drive aisle

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Packet WORK_1790298962496_3rhqpt3