Expired
a resident's own home, Ozona, TX 76943 (Crockett County; best-estimate location, exact address not confirmed)
Retrofit the resident's own well-pump motor to high efficiency with a VFD, a resident's own home, Ozona, TX (Crockett County).
A licensed electrician replaces a resident's well pump motor with a high-efficiency motor and variable-frequency drive at a resident's own home, then takes a post-retrofit amperage reading. Read all of it
Lapsed. Nothing is owed and nothing is waiting.
It is kept here so the link never dies. See work that is open now.
All of it: the words, the place, the proof
Retrofit the resident's own well-pump motor to high efficiency with a VFD, a resident's own home, Ozona, TX (Crockett County). This resident's own well-pump motor runs constant-speed well below its rated efficiency, burning real electricity against every irrigation and household draw; swapping in a high-efficiency motor with a variable-frequency drive matches output to actual demand and cuts that draw immediately.
This one lapsed at $240. Similar work is open on the board.
Safety, read before you claim
Licensed electrician only: de-energize and lockout/tagout the circuit before any motor or panel work; never service an energized panel. Resident sign-off precedes work.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the resident's permission and the pump's current nameplate rating, and photograph the existing motor before work.
- 2. Licensed electrician de-energizes and locks out/tags out the circuit before any motor or panel work; never service an energized panel.
- 3. Install the high-efficiency motor and variable-frequency drive, matching nameplate and drive parameters to the well's rated flow.
- 4. Restore power, commission the drive, and photograph the running pump with a post-retrofit amperage reading.
What counts as done
- Licensed-electrician lockout-tagout record for the motor swap
- Before photo of the old constant-speed motor nameplate
- Confirmation that the new high-efficiency motor and VFD were commissioned to the well's rated flow
- Post-retrofit amperage reading showing the reduced electrical draw at matched output
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Energy Efficiency Audit. Energy efficiency work begins with the walkthrough audit, the kind the ASHRAE standard describes: a trained eye moving through a building, reading the bills, the walls, the lights, and the equipment, and coming out with the short list of fixes worth doing first. Mastery looks like an auditor who can feel where a building is bleeding money within the hour, and prove it on paper. That instinct is trained by repetition on real buildings. This packet is one repetition: one system observed, one reading taken, one finding recorded the way the standard asks.
What is promised, and what is not
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Packet WORK_1790565758476_huvfi5d