a gully cutting through the back of a resident's own rural property, Leakey, TX 78873 (Real County; best-estimate location, exact address not confirmed)

Armor the drop.

Armor the drop in the gully with a rock rundown so water can't cut it deeper, a resident's own property, Leakey, TX Read all of it

Lapsed. Nothing is owed and nothing is waiting.

This packet has expired.

It is kept here so the link never dies. See work that is open now.

All of it: the words, the place, the proof

Armor the drop in the gully with a rock rundown so water can't cut it deeper, a resident's own property, Leakey, TX (Real County). A second drop, a nick point, sits a short distance below the headcut treated by the rung before this one; left alone, this is the next point in line to become the next headcut. A rock rundown, an armored ramp of hand placed rock laid over the drop, lets water descend across stone the whole way down instead of digging its own new step, so the grade below the head stops advancing too.

This one lapsed at $190. Similar work is open on the board.

Where
a gully cutting through the back of a resident's own rural property, Leakey, TX 78873 (Real County; best-estimate location, exact address not confirmed). Open the map
Pay
$190 lapsed

This job expired before anyone claimed it. Nothing is owed and nothing is waiting.

Proof
weather/upstream check confirm + permission/permit confirm + before/after photos + ramp grading confirm + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Lapsed
2026-11-12
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

If rain is forecast in the watershed, or the channel is wet or flowing, this work waits for a dry, clear day. Confirm resident permission and whether the county requires a permit for placing rock in this channel before starting.

The full safety list for this job:

  • Before anything else, check the weather forecast for this whole watershed and check upstream conditions, not just the sky overhead.
  • If rain is forecast anywhere in the watershed today or tonight, or water is already flowing in the channel, or the channel bed is still wet from a recent rain, this work does not proceed and is rescheduled for a dry, clear day with a dry channel.
  • Confirm permission from the resident or property owner, and confirm with the county floodplain or drainage office whether a permit is required for placing rock in this channel, since permit rules can apply even on private property when a channel sits inside a mapped floodplain, before placing a single rock.
  • This work does not begin until that confirmation is in hand.
  • Hand tools and hand carried native rock only.
  • No digging machine, no skid steer, and no power equipment of any kind appears anywhere in this work.
  • Two person handling for any rock too heavy to carry alone, and no rock is ever lifted above waist height.
  • Sturdy gloves and boots are worn at all times, and rocks are lifted with the legs, never the back.
  • The finished structure is never taller than knee height.
  • If the site genuinely needs anything taller than that, this is not a job for this rung; that is dam engineering, and it needs an engineer and a permit.
  • This work never builds a beaver dam analog or a post assisted structure of any kind.
  • Every structure here is loose, hand placed native rock only, never wood, never posts, never wire.
  • Summer heat on exposed rock and dry channel ground in this part of Texas is severe with little shade.
  • Work in the early morning or evening, carry more water than you think you need, wear sun protection, and take frequent shade breaks.
  • Rattlesnakes, fire ants, and thorny brush are common on this ground.
  • Watch foot and hand placement before reaching under or behind any rock, and give any snake a wide path.
How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. Walk to the nick point on stable, dry ground and photograph it before starting, noting its approximate drop height.
  2. 2. Confirm permission and any permit requirement exactly as described in this rung's safety notes before placing a single rock.
  3. 3. Hand place overlapping rock in a graded ramp across the drop, largest rock at the toe of the ramp and smaller rock upstream, so water sheets across stone the whole way down rather than plunging over a bare edge.
  4. 4. Confirm the finished ramp is knee height or lower at its highest point and photograph it from the same before vantage.

What counts as done

  • Before photo of the nick point showing its approximate drop height
  • Confirmation that the weather and upstream conditions were checked and the channel was dry before work began
  • Confirmation that permission and any required permit were confirmed before the first rock was placed
  • After photo of the finished rundown ramp from the matching before vantage, with rock grading (large to small, toe to head) recorded
  • Site record: the exact site's name and street address, and the contact who agreed to the work

Proof is measured against these, not judged by taste.

The standard this serves

Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.

What is promised, and what is not

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.