At the home / Falls Church, VA area
Home mold moisture-source and extent audit (EPA guidance) — Falls Church, VA.
Inspect a Falls Church-area home for moisture sources and visible mold growth using the EPA area threshold. Read all of it
Not funded yet. Settles as earned credit, $150 proposed.
Proof it takes, the deadline, the level
- ProofMoisture risk points inspected: roof, plumbing, windows, foundation, appliances, HVAC + Indoor humidity reading recorded in problem rooms + Visible growth photographed, measured without disturbance + Routing recorded per EPA area, HVAC, sewage thresholds + Clinician referral recorded for occupant symptoms
- Open until2026-12-27
- Levelentry
All of it: the words, the place, the proof
Inspect a Falls Church-area home for moisture sources and visible mold growth using the EPA area threshold. The national professional association for the exact credential this standard's own Level III threshold names -- a licensed industrial hygienist -- is headquartered here.
Offer to pay $150. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Visible growth over about 10 sq ft, any HVAC involvement, or any sewage origin routes to professional remediation, no exceptions. Occupant respiratory or allergic symptoms route to a clinician, and never scrub, sand, or aerosolize growth before it is assessed.
The full safety list for this job:
- This is a moisture-source audit and mapping only, never remediation itself.
- This packet is independent of and not affiliated with AIHA: named as the real, verified national professional association for the Level III credential this standard's own EPA guide names, not an endorsement or partnership.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- A flashlight and a moisture meter or hygrometer
- Camera for photographing visible growth and moisture sources without disturbing them
- Measuring tape for mapping growth extent in square feet
- A written home moisture-source checklist (roof, plumbing, windows, foundation, HVAC, appliances)
- Prior audit records where they exist
Steps
- 1. Walk the home's moisture-risk points: roof and gutter condition, plumbing fixtures and supply lines, window and door seals, foundation/basement/crawlspace, and appliance connections (washer, dishwasher, water heater, HVAC condensate).
- 2. Take indoor relative-humidity readings in problem-prone rooms (bathrooms, basements, kitchens); note readings above the EPA-recommended range as a risk factor.
- 3. Record every active or past moisture source found: its location, apparent cause (leak, condensation, ventilation gap), and whether it is currently active.
- 4. Where visible mold growth is present, photograph and measure its extent in square feet WITHOUT disturbing, scrubbing, or aerosolizing it — disturbance before assessment can spread spores.
- 5. Note whether growth is near or inside HVAC components/ductwork, or whether it followed a sewage backup or other contaminated-water event.
- 6. Sum the total visibly affected area across all locations found.
- 7. Route per the decision rules: self-manageable small area with the moisture source fixed first, or professional remediation referral for the qualifying conditions.
- 8. Record any reported occupant health symptoms (respiratory, allergic) separately and route those to a clinician, independent of the remediation-size routing.
What counts as done
- All standard moisture-risk points inspected and recorded (roof/gutter, plumbing, windows, foundation, appliances, HVAC)
- Indoor humidity reading(s) recorded in problem-prone rooms
- Any visible growth photographed and its extent measured (sq ft) WITHOUT disturbance
- Routing recorded: self-manage vs professional remediation per the EPA threshold, plus any clinician referral for occupant symptoms
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Open, but not claimable yet. restricted: regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790591423071_cn7x6cj