Los Angeles, CA (community building, exact site not yet named)
Depave the schoolyard and plant the freed ground.
A worker wet-cuts the schoolyard paving along marked lines with a saw at the site, then lifts out the pieces, freeing the ground for soil and plants. Read all of it
Not funded yet. Settles as earned credit, $960 proposed.
Proof it takes, the deadline, the level
- Proofpermit + before/after photos + saw-cut/removal spec, soil-fill/grading log + native-plant list + infiltration water-test video + GPS
- Open until2026-11-28
- Leveladvanced
All of it: the words, the place, the proof
Remove the schoolyard asphalt and plant the freed ground in Los Angeles, CA. This packet does not assert a surveyed condition beyond that. The proof requirements listed on this packet are what counts as done. Name the exact site and confirm it with its host before you claim: this listing gives only the area. Part of the schoolyard is paved over, leaving no open ground for plants or for water to soak in.
Offer to pay $960. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Trained crew only: right-of-way/school-district permit, 811 locates, wet-cut dust controls (respirable silica); work scheduled outside school hours, campus fully fenced off during demolition; district facilities sign-off precedes work.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Write down the exact site's name and street address and the contact who agreed to the work, and confirm both with that contact.
- Obtain the permit, the 811 locate references and the district facilities sign-off, and record each reference number.
- Photograph the paved section to be removed as found and record the GPS position.
- Mark the saw-cut lines on the paving and write the saw-cut and removal spec with the area and depth.
- Cut the paving along the marked lines with wet cutting and break out and lift the pieces to the spec.
- Haul the debris to disposal and record where it went and how much.
- Spread engineered soil into the freed ground, grade it to drain, and log the fill depth and grading.
- Plant the native or adapted plants and write the plant list.
- Pour water on the planted section, record video of it soaking in, and record the drainage time within 24 to 48 hours.
- Photograph the planted section from the before vantage and submit the permit, spec, disposal, fill, plant and water-test records with it.
What counts as done
- Before photo of the paved section targeted for depaving
- Permit + 811 locate references before any saw-cutting or excavation
- Saw-cut/removal spec and hauled-debris disposal record
- Engineered-soil fill and grading log + native/adapted plant list
- After photo of the planted section + infiltration water-test video showing drainage within 24-48 hours
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.