← Board

public sidewalks of Vignes Street and Cesar Chavez Avenue at Gateway Plaza, Downtown Los Angeles, CA

Keep the public inlet grates clear around Link Union Station early works beside Metro headquarters, One Gateway Plaza, Los Angeles.

Rake every public storm grate clear around the Union Station and Metro headquarters build and bag the sediment. Read all of it

Not funded yet. Settles as earned credit, $80 proposed.

Proof it takes, the deadline, the level
  • Proofeach grate photographed before, after with GPS + material weighed, counted + any full basin filed, never opened
  • Open until2026-10-06
  • Levelentry
All of it: the words, the place, the proof

Rake every public storm grate clear around the Union Station and Metro headquarters build and bag the sediment. The public storm inlets on Vignes Street between Cesar Chavez Avenue and the US-101 overpass, and Cesar Chavez Avenue at the Gateway Plaza edge take the build's sediment first and clog first, and a clogged inlet floods the crossing in the first rain. Weigh or count what came off, and photograph each grate before and after. A basin full to the grate is filed on MyLA311, the City of Los Angeles service request line, and Metro's 24-hour project hotline with the reference number recorded, never opened.

Fund it for $80. Proof lands onchain when it's done.

Where
public sidewalks of Vignes Street and Cesar Chavez Avenue at Gateway Plaza, Downtown Los Angeles, CA. Open the map
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
each grate photographed before, after with GPS + material weighed, counted + any full basin filed, never opened

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-10-06
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • GPS phone with a camera and the local rain record open
  • hi-vis vest and rain gear for after-rain observation, never during a downpour
  • a garden rake and heavy bags for the grate clearing run
  • a luggage scale or a count of bags
  • the city's stormwater reporting line and the regional water board's complaint line open
  • a hashing tool for the anchor step

Steps

  1. 1. From public ground, locate every public storm inlet on the perimeter block with a GPS point and photograph each one with its protection state: protected (a cover, a gravel bag ring, a filter insert visible), bare, or clogged.
  2. 2. Read the fence line from the sidewalk: silt fence, fiber rolls or gravel bag berms visible and whole, or fallen, gapped or buried, each photographed with a GPS point. Nothing is entered and nothing is touched on the build side.
  3. 3. After each rain, return within a day and log muddy water at the curb, sediment on the sidewalk and in the gutter, a discharge from the gate, and the rain's date beside each photo's time. File a discharge with the city's stormwater line and with the regional water board, and file a clogged inlet with the city, recording every reference number.
  4. 4. For the weekly grate run, photograph each grate, rake its surface clear of sediment, gravel and litter into bags, weigh or count the bags, photograph it again, and file any basin full to the grate with the city. The grate is never lifted and nothing is reached into the basin.
  5. 5. Publish the log or the run with its photos, times, weights and reference numbers, without any statement that the site is compliant or in violation, and anchor its content hash via vealth.net/anchor.

What counts as done

  • Each inlet grate photographed before and after from the same angle, with its GPS point
  • The material removed, bagged, weighed or counted, and where it went
  • Any basin full to the grate filed on the city's line with the reference number, never opened

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790725026099_q6gmnpm","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1790725026099_q6gmnpm