the public Jim Ned Creek or Hords Creek trail or public road bridge crossing near Coleman, TX 76834, Coleman County (public creek right of way, bank-top segment)
Plant native riparian cover on a creek bank near Coleman, site 2, the public Jim Ned Creek or Hords Creek trail or public road bridge crossing near Coleman, TX 76834, Coleman County (public creek righ.
Plant native riparian cover by hand on the bank-top segment of Jim Ned Creek or Hords Creek near Coleman, TX. Read all of it
Not funded yet. Settles as earned credit, $165 proposed.
Proof it takes, the deadline, the level
- Proofbefore after photos plus species and plant count record plus GPS
- Open until2026-10-30
- Levelintermediate
All of it: the words, the place, the proof
Plant native riparian cover by hand on the bank-top segment of Jim Ned Creek or Hords Creek near Coleman, TX. The survey above found a bare or eroding bank-top segment of Jim Ned Creek or Hords Creek near Coleman, and hand planted native riparian cover above the waterline would otherwise leave this bank shedding soil into the upper Colorado River headwaters system for another season.
Fund it for $165. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm the bank-top segment from the public creek trail or bridge crossing and photograph the bare or eroding bank before starting, staying above the waterline.
- 2. Hand dig planting holes on the bank top only, hand tools only, no power equipment, staying well above the waterline and never entering the channel.
- 3. Hand plant native riparian grass, sedge, or shrub species suited to this creek system at the bank-top margin.
- 4. Hand mulch around the new plantings and photograph the planted bank from the matching before vantage, recording species and plant count.
What counts as done
- Before photo of the bare or eroding bank-top segment
- Confirmation only hand tools were used, work stayed above the waterline, never entering the creek channel
- Native species and plant count recorded
- After photo of the planted bank-top segment from the matching vantage
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790755712585_8g9r9tm","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790755712585_8g9r9tm