Los Angeles, CA (community garden, exact site not yet named)
Install drip irrigation on the garden bed.
A worker connects drip tubing with a battery timer to the hose bib along the new bed at Los Angeles, watering it automatically. Read all of it
Not funded yet. Settles as earned credit, $380 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + emitter-spacing log + pressure-regulator/backflow-preventer photo + leak/flow test video + GPS
- Open until2026-10-30
- Levelintermediate
All of it: the words, the place, the proof
Install a hose-fed drip line with a timer on the garden bed at a community garden in Los Angeles, CA. The bed has no watering plan and cannot be hand-watered daily, and the timer keeps it consistent. Name the exact site and confirm it with its host before you claim: this listing gives only the area.
Fund it for $380. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Meet the garden host at the community garden this job names, confirm the exact site's name and street address, and get their consent to install.
- Photograph the unwatered bed as found.
- Connect a backflow preventer and pressure regulator at the hose-bib tap and photograph the connection.
- Run the header line to the bed and space the emitters to match the planted rows, adding the timer, then log the emitter spacing and rate.
- Keep the tubing clear of the walkway travel path as you lay it.
- Turn the system on and record a video of the flow test, showing every emitter wetting evenly with no blown fittings.
- Record the site's name, street address, and the host contact who agreed to the work as your proof record.
What counts as done
- Before photo of the unwatered bed
- Backflow-preventer and pressure-regulator photo at the hose-bib connection
- Emitter spacing/rate log matched to the planted rows
- Leak/flow-test video showing every emitter wetting evenly with no blown fittings
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Water Efficiency. Water efficiency is the quiet discipline of wasting nothing indoors. The EPA's WaterSense program sets the marks: how many gallons a minute a faucet should pass, how to find the leak that runs a toilet all night, how a household's water bill tells a story. Mastery looks like an auditor who can walk a home in an hour and find every hidden gallon. The skill is built one fixture at a time, which is exactly what this packet asks: measure one flow, find one leak, record one truth about where the water goes.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790765272114_2wm50gr","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790765272114_2wm50gr