Philadelphia, PA (public right-of-way, exact site not yet named)
Build a vegetated bioswale.
Plant a graded bioswale on the frontage at a public right-of-way in Philadelphia, PA. Read all of it
Not funded yet. Settles as earned credit, $620 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + infiltration test + planting log + GPS
- Open until2026-10-30
- Levelintermediate
All of it: the words, the place, the proof
Plant a graded bioswale on the frontage at a public right-of-way in Philadelphia, PA. The frontage sheds runoff straight to the storm drain during every storm, and the swale slows and filters that flow before it leaves the block. Name the exact site and confirm it with its host before you claim: this listing gives only the area.
Fund it for $620. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Get the facilities manager's consent for the build, and confirm the exact site within the named area, recording its name, street address, and the contact who agreed.
- Call 811 to have underground utilities located before digging.
- Photograph the runoff path at the site as it is now, before any work begins.
- Grade a swale bed by hand along the low edge to catch the runoff before it leaves the block.
- Plant the graded bed with suitable vegetation.
- Photograph the finished, graded and planted swale.
- Run an infiltration water test on the finished swale and record it with photo or video.
- Submit the before photo, the after photo, the infiltration water-test record, and the site record (name, address, contact) as your proof.
What counts as done
- Before photo of the runoff path
- After photo of the graded, planted swale
- Infiltration water-test photo/video
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790770290797_c93hjaq","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790770290797_c93hjaq