← Board

Sa

Install WaterSense pre-rinse spray valve and low-flow fixtures on the 700 block of S Zarzamora St (public right-of-way + typical commercial/food-service conditions), San Antonio, TX 78207.

Confirm the pre-rinse spray valve with the owner and test its flow rate before the swap, on the 700 block of S Read all of it

Not funded yet. Settles as earned credit, $240 proposed.

Proof it takes, the deadline, the level
  • Proofbefore/after flow-rate readings + fixture nameplate photos + GPS
  • Open until2026-10-30
  • Levelentry
All of it: the words, the place, the proof

Confirm the pre-rinse spray valve with the owner and test its flow rate before the swap, on the 700 block of S Zarzamora St. The dish-pit pre-rinse spray valve at this taquería runs at old high-flow rates through every lunch and dinner rush; a WaterSense swap cuts real water and water-heating cost at zero change in dish-cleaning speed.

Fund it for $240. Proof lands onchain when it's done.

What it looks like
A worker swaps a showerhead for a WaterSense fixture at the 700 block of S Zarzamora St (public right-of-way + typical commercial/food-service conditions), turning full-force spray into a low-flow stream.

A description of this kind of work, not a record that it happened here.

Where
Sa, the 700 block of S Zarzamora St (public right-of-way + typical commercial/food-service conditions), San Antonio, TX 78207. Open the map
Pay
$240 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after flow-rate readings + fixture nameplate photos + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-10-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Confirm with the owner which pre-rinse spray valve and fixture the job covers before starting.
  2. Run a bucket-and-timer flow test on the existing pre-rinse spray valve and record the before flow rate.
  3. Shut off the fixture's own stop valve before removing the old spray valve.
  4. Remove the old spray valve by hand and thread on the new low-flow WaterSense-labeled replacement.
  5. Reopen the stop valve and check the new spray valve for leaks at the connection.
  6. Photograph the new fixture's WaterSense label.
  7. Run the same bucket-and-timer flow test on the new spray valve and record the after flow rate.
  8. Record the GPS location with the before and after readings and the nameplate photo as the job's proof.

What counts as done

  • Before flow-rate reading (bucket-and-timer test)
  • WaterSense-labeled fixture nameplate photo after install
  • After flow-rate reading confirming the reduced GPM

Proof is measured against these, not judged by taste.

The standard this serves

Water Efficiency. Water efficiency is the quiet discipline of wasting nothing indoors. The EPA's WaterSense program sets the marks: how many gallons a minute a faucet should pass, how to find the leak that runs a toilet all night, how a household's water bill tells a story. Mastery looks like an auditor who can walk a home in an hour and find every hidden gallon. The skill is built one fixture at a time, which is exactly what this packet asks: measure one flow, find one leak, record one truth about where the water goes.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790771480225_luoun5t","funderWallet":"0xYOU"}.

Open, but not claimable yet. The work qualification registry could not be read (registry file not found at /home/ubuntu/ecowealth-production-20260912/data/standards/work-qualification-v0.json), so no packet's requirements can be established. The requirement is a structured fact about this kind of work, not a line of the packet's text, and an attestation does not establish it. It is not claimable yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1790771480225_luoun5t