← Board

the 300 block of E Eighth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203

Replace a failed single-pane window on a home on the 300 block of E Eighth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75212 75203 (site A).

Single-pane, painted-shut original windows on this pre-1978 block waste heat all winter and cooling all summer; a code-compliant dual-pane replacement is the Read all of it

Not funded yet. Settles as earned credit, $780 proposed.

Proof it takes, the deadline, the level
  • ProofEPA RRP lead-safe work-practice photos + permit + before/after photos + GPS
  • Open until2026-10-30
  • Leveladvanced
All of it: the words, the place, the proof

Single-pane, painted-shut original windows on this pre-1978 block waste heat all winter and cooling all summer; a code-compliant dual-pane replacement is the direct Energy-petal repair the weatherization readiness survey points to.

Fund it for $780. Proof lands onchain when it's done.

What it looks like
An EPA RRP certified renovator sets up plastic containment, removes the painted single-pane sash at the 300 block of E Eighth Street, and installs a flashed, sealed dual-pane replacement.

A description of this kind of work, not a record that it happened here.

Where
the 300 block of E Eighth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203. Open the map
Pay
$780 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
EPA RRP lead-safe work-practice photos + permit + before/after photos + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
advanced
Open until
2026-10-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Confirm owner consent and scheduling for the window this job's title names, before starting.
  2. Set up the containment required for this pre-1978 block before disturbing the painted sash.
  3. Photograph the failed window and the containment setup, showing conditions before removal.
  4. Remove the failed sash using wet methods, and clean up with HEPA-filtered equipment.
  5. Record the permit reference and the disposal manifest for the removed sash.
  6. Set the new dual-pane replacement window into the opening, level and plumb, and fasten it per the manufacturer's instructions.
  7. Seal and flash the perimeter of the new window and trim it out.
  8. Photograph the installed, flashed, and sealed replacement window.
  9. Record the GPS location of the completed work.

What counts as done

  • Before photo of the failed window + EPA RRP lead-safe containment setup (pre-1978 home)
  • Permit reference and disposal manifest for the removed sash
  • After photo of the installed, flashed, and sealed replacement window

Proof is measured against these, not judged by taste.

The standard this serves

Weatherization Readiness. Weatherization readiness is the survey that turns a cold, expensive-to-heat home into a fundable plan. Following the Department of Energy's program, the surveyor maps where the house leaks air, which attics and walls lack insulation, what fresh-air path must follow the tightening, and which safety checks must clear first. Mastery looks like a walkthrough that ends with a package a weatherization crew can price without a second visit. This packet is one piece of one such survey, done carefully and written down, so a real family's real house gets closer to warm.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790771506272_mkxcbda","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1790771506272_mkxcbda