the 400 block of E Ninth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203
Replace a gas furnace with a heat pump on the 400 block of E Ninth Street, Tenth Street Historic District, Oak Cliff, Dallas, TX 75203.
A licensed technician recovers refrigerant from the old gas furnace, mounts the new heat pump at the 400 block of E Ninth Street, and commissions it before the inspection. Read all of it
Not funded yet. Settles as earned credit, $880 proposed.
Proof it takes, the deadline, the level
- Proofpermit + commissioning sheet + before/after photos + inspection result + GPS
- Open until2026-10-30
- Leveladvanced
All of it: the words, the place, the proof
Replace the gas furnace with a right-sized heat pump in a home on the 400 block of E Ninth Street, Oak Cliff, Dallas. Gas furnaces in this block's older housing burn fossil fuel for every hour of heat; a right-sized heat pump is the Energy-petal repair the audit points to, and it cools too, which these units mostly can't.
Fund it for $880. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- Manual J/S load calculation + approved permit
- heat-pump equipment (outdoor + indoor units), line set, pad/brackets, condensate handling
- refrigerant gauges/scale + vacuum pump + torque tools (EPA 608-certified technician)
- multimeter + thermometer/anemometer for commissioning airflow and delta-T
Steps
- 1. ASSESS: verify the Manual J/S sizing against the home (envelope, ductwork or head locations), confirm electrical capacity for the new circuit, and photograph the existing system and nameplates.
- 2. Decommission and recover refrigerant from the old system per EPA 608; remove equipment for lawful disposal/recycling and document it.
- 3. Set and mount the new equipment, run and braze/flare the line set, pull vacuum to spec, and release/weigh in charge per manufacturer; a licensed electrician lands the new circuit and disconnect.
- 4. Commission: verify airflow, refrigerant charge (subcooling/superheat per spec), heating and cooling delta-T, and condensate drainage; set up controls/thermostat.
- 5. VERIFY: pass the mechanical/electrical inspection; record commissioning numbers and before/after photos; leave the owner the manual, warranty registration, and maintenance schedule.
What counts as done
- Before photos incl. old-equipment nameplates + refrigerant-recovery record
- Commissioning sheet (vacuum, charge method, delta-T, airflow)
- Permit inspection pass reference
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790771538835_i50uo4y","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: permit-required, regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790771538835_i50uo4y