the 900 block of Grier Street, Seversville, West Charlotte, Charlotte, NC 28216
Install gutter guards on a home on the 900 block of Grier Street.
Install gutter guards on a home on the 900 block of Grier Street. Read all of it
Not funded yet. Settles as earned credit, $360 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + guard-fit check + GPS
- Open until2026-10-30
- Levelintermediate
All of it: the words, the place, the proof
Install gutter guards on a home on the 900 block of Grier Street. This home's gutters clog with leaf litter from the block's mature street trees every fall, forcing repeat cleanings; screened gutter guards cut that maintenance burden and stop the overflow that has been rotting the fascia board.
Fund it for $360. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- camera
- gutter scoop or garden-hose gutter wand + bucket/tarp
- stepladder (6 ft max) + a spotter
- caulk gun + paintable/exterior sealant + patching compound
- rake, tarp, and yard-waste bags
- tape measure + line level or 4-ft level
- gloves + safety glasses
Steps
- 1. Photograph the gutter run, downspouts, exterior debris, and any envelope gaps or grading problem as found, from the vantage points that will be used again after.
- 2. Confirm scope with the occupant/owner and confirm the home's condition (post-1978, or pre-1978 with intact/unpainted-substrate work only -- any disturbed pre-1978 paint STOPS this scope and routes to an EPA RRP lead-safe pro).
- 3. From a stepladder no taller than 6 ft with a spotter (or from the ground for single-story eaves reachable by wand/scoop), clear debris from gutters and confirm downspouts drain freely and discharge at least several feet from the foundation; re-secure any loose gutter hangers.
- 4. Clear accumulated exterior debris/junk from the immediate building perimeter, porch, and walkway so drainage paths and pest-entry points stay clear; bag/stage yard waste for pickup.
- 5. Patch and seal small envelope gaps at trim, soffit, and utility penetrations with exterior-rated caulk or patching compound, and regrade a short run of soil away from the foundation where it currently slopes toward it.
- 6. Verify: gutters run clear water end-to-end, downspouts discharge away from the foundation, patched gaps are weathertight, and the perimeter is clear; photograph the finished work from the same vantage as the before photos.
- 7. Enter before/after photos, materials used, and any hazard flagged (active leak, structural rot, suspected lead paint) into the proof record; sign.
What counts as done
- Before photo of the bare, leaf-clogged gutter
- After photo of the installed, seated guards
- Fit-check confirming no gaps at joints/end caps
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790771838626_vw36teq","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790771838626_vw36teq