Indianapolis, IN (public right-of-way, exact site not yet named)
Clear and repair the gutters and downspouts.
Clear and repair the gutters and downspouts at a public right-of-way in Indianapolis, IN. Read all of it
Not funded yet. Settles as earned credit, $360 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + planting list + infiltration check + GPS
- Open until2026-10-30
- Levelintermediate
All of it: the words, the place, the proof
Clear and repair the gutters and downspouts at a public right-of-way in Indianapolis, IN. The gutters and downspouts at a public right-of-way in Indianapolis, IN are clogged and separated, dumping roof runoff down the walls instead of away. Clearing and repairing them protects the building.
Fund it for $360. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Get consent from the site's staff contact before starting work.
- Photograph the downspout in its current state, discharging directly against the wall.
- Clear debris and repair the separated gutter and downspout sections along the right-of-way.
- Disconnect the downspout from its direct-discharge run and redirect it to feed the planted basin.
- Photograph the downspout now feeding the planted basin.
- Pour water into the basin and confirm it absorbs within a set time, recording the infiltration check.
- Record the site contact's name, role, and the date they agreed as the host confirmation.
- Submit the before and after photos, the infiltration check, and the host confirmation as proof.
What counts as done
- Before photo of the direct-discharge downspout
- After photo of the disconnected downspout feeding the planted basin
- Infiltration check (water absorbs within a set time)
- Host confirmation: the site contact's name and role, and the date they agreed
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790773591277_7i3uxj7","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790773591277_7i3uxj7