the Palmer Avenue residential corridor, Allensworth, CA 93219

Install a water-bottle refill station on Palmer Avenue, the Palmer Avenue residential corridor, Allensworth, CA 93219.

Install a public water-bottle refill point along this corridor so residents stop carrying their drinking water from home through the Valley's extreme Read all of it

Not funded yet. Settles as earned credit, $220 proposed.

Proof it takes, the deadline, the level
  • Proofbefore/after photos + backflow-preventer photo + flow-test video + GPS
  • Open until2026-10-30
  • Levelintermediate
All of it: the words, the place, the proof

Install a public water-bottle refill point along this corridor so residents stop carrying their drinking water from home through the Valley's extreme summer heat.

Fund it for $220. Proof lands onchain when it's done.

Where
the Palmer Avenue residential corridor, Allensworth, CA 93219. Open the map
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after photos + backflow-preventer photo + flow-test video + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-30
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Photograph the corridor site without refill access.
  2. Have a licensed plumber install the backflow preventer at the supply connection under a permit.
  3. Have the licensed plumber connect the station at the potable-source tie-in.
  4. Run the flow test and record a video of clean, steady water delivery.
  5. Install the labeled station and photograph it after installation.
  6. Record the GPS location with the before, backflow, flow-test, and after proof.

What counts as done

  • Before photo of the site with no refill access
  • Backflow-preventer photo at the supply connection
  • Flow-test video confirming clean, steady water delivery
  • After photo of the installed, labeled station

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790789774544_63kg70z","funderWallet":"0xYOU"}.

Open, but not claimable yet. restricted: permit-required, regulated. Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.